25 Paidge Avenue, Brooklyn
Industrial · built c. 1930 · Block 2491, Lot 1.
Building permits
- Alteration, filed Sep 3, 2026, estimated cost $1.2M, described as “Loading rack and tank piping modifications. No change in egress, use, or occupancy”
- Alteration, filed Dec 29, 2022, estimated cost $19K, described as “Repair of tank 49 floor”
- Alteration, filed Jan 16, 2020, estimated cost $20K, described as “Erect 400 lf of 8' high wood construction fence to enclose site”
Building history
- Demolition, filed Feb 28, 2018, signed off Sep 15, 2020, stories 1 to 0, described as “Full building desolation of one story warehouse using mechanical means”
- Demolition, filed Feb 13, 2018, signed off Sep 15, 2020, stories 1 to 0, described as “Full building desolation of one story warehouse using mechanical means”
- Demolition, filed Jan 25, 2018, application processed - no plan exam, stories 1 to 0, described as “Full building demolition of one story warehouse using mechanical means”
- New Building — Tower, filed Jul 25, 2001, plan exam - disapproved, 31 stories
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $3,469,500
- 2026–27 Tax
- $346,877
- Market value (city estimate)
- $7,710,000
- Taxable value
- $3,194,370
- Assessed land
- $2,187,900
- Assessed improvements
- $1,281,600
Zoning
M3-1: floor area ratio 0.09 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Sep 28, 2018: $62,000,000
- Dec 21, 2017: $5,947,118
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 321-01-BZ): Variance or Special Permit, Withdrawn, filed Nov 2, 2001, decided Oct 8, 2002. Special Permit (§73-30) to permit the proposed construction of a 475' lattice communications tower, and two prefabricated 12' x 20' equipment shelters at the base of the tower, located in an M3-1 zoning district, which requires a special…