287 Maspeth Avenue, Brooklyn
Utility · Block 2837, Lot 1.
Building permits
- New Building — Non-residential, filed Feb 2, 2023, estimated cost $2.5M, 2 stories, described as “Propose a New 2-Story Building (National Grid)”
- New Building, filed Aug 10, 2021, 1 story, described as “Construction of a concrete masonry saltwater pump house consisting of an elevated concrete floor slab, concrete masonry unit walls, and steel roof with the structure being supported by concrete columns, grade beams, and driven piles.”
- Alteration, filed Jun 18, 2026, estimated cost $114K, described as “Removal of cng fleet fueling eq & conc. Pads. Restore asphalt and gravel areas per plans. No change to use, egress or occupancy. Per ac 28-105-4-3 NYC administrative code, public utility gas work shown in this app shall be exempt from NYC…”
- Alteration, filed Jun 17, 2026, estimated cost $44K, described as “Filing for Boiler as per plans submitted. No change to egress, use, or occupancy.”
- Alteration, filed Apr 9, 2026, estimated cost $287K, described as “Installation of new structural steel dunnage, new 16-inch reinforced concrete piers, and concrete pad extension at exterior grade to support new ACC units. Includes anchorage, welding, bolting, grating, pipe railing, and required special…”
- Alteration, filed Mar 31, 2026, estimated cost $300K, described as “Exterior repairs to exist three walled steel structure for national grid. Use per sect. 28-105-4.3 of NYC ac, public utility gas work shall be exempt from NYC bldg permit no change to use, egress or occupancy.”
- Alteration, filed Mar 9, 2026, estimated cost $1.9M, described as “Installation and modification of mechanical HVAC systems, including rooftop HVAC equipment, interior ductwork, piping, dampers, controls, sensors, and associated appurtenances serving the 1st Floor. No change to use, egress, or occupancy.”
- Alteration, filed Feb 25, 2026, estimated cost $400K, described as “Roof Replacement”
- Alteration, filed Feb 6, 2026, estimated cost $290K, described as “Proposed interior renovations of service building as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 13, 2025, estimated cost $200K, described as “Filing herewith for alteration to existing wet sprinkler system. No change in use, egress, or occupancy.”
- Alteration, filed Sep 8, 2025, estimated cost $1.0M, described as “The scope of work includes installation of new structural framing with footings and foundations for new nitrogen tanks, vaporizers, pipes, and other ancillary structures.”
- Alteration, filed Aug 6, 2025
- Alteration, filed Jan 31, 2025, estimated cost $562K, described as “Filing herewith for 1) alteration of existing wet sprinkler system (demo and new installation); 2) installation of temporary sprinkler loop during construction; 3) installation of new dry sprinkler system. No change use, egress, or…”
- Alteration, filed Jan 31, 2025, estimated cost $267K, described as “Filing herewith for the installation of a new wet and new dry sprinkler system. No change in use, egress, or occupancy.”
- Alteration, filed Jan 30, 2025, estimated cost $500K, described as “Excavation and back filling of two pits with sheeting & shoring to install new heating elements below the existing lng tank using a guided boring system as per plans filed herewith. No changes to egress, use or occupancy(zone 3 drill pit)”
- Demolition, filed Jan 7, 2025, estimated cost $1.5M, described as “Full demolition of two story structure using hand held and mech means”
- Alteration, filed Dec 11, 2024, estimated cost $5K, described as “Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.”
- Alteration, filed Nov 27, 2024, estimated cost $2.0M, described as “Excavation and back filling of two pits with sheeting & shoring to install new heating elements below the existing lng tank using a guided boring system as per plans filed herewith. No changes to egress, use or occupancy (zone 1- drill &…”
- Alteration, filed Nov 27, 2024, estimated cost $1.5M, described as “Excavation and back filling of one pit with sheeting & shoring to install new heating elements below the existing lng tank using a guided boring system as per plans filed herewith. No changes to egress, use or occupancy”
- Alteration, filed Aug 30, 2024, estimated cost $20K, described as “Install (2) new boilers related to job# B08010032-I1. No change in use, egress or occupancy filed under this application.”
- Alteration, filed Jun 12, 2024, estimated cost $205K, described as “Structural Steel column work”
- Alteration, filed May 17, 2024, estimated cost $67K, described as “Gas plumbing work related to the installation of a new emergency systems power generator for building 13”
- Alteration, filed May 17, 2024, estimated cost $123K, described as “New Emergency Generator for the Facilities Building.”
- Alteration, filed May 17, 2024, estimated cost $65K, described as “Gas plumbing work related to the installation of a new emergency systems power generator for meter ops building”
- Alteration, filed May 17, 2024, estimated cost $147K, described as “Gas plumbing work related to the installation of a new emergency systems power generator for the facilities building”
51 more, older permits are in this building’s full list on the map.
Zoning
M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.