89 Maspeth Avenue, Brooklyn
Apartment building · 311 units · built 2025 · Block 2885, Lot 1.
Building permits
- New Building — Mid-Rise, filed Dec 13, 2021, 311 units, 18 stories, described as “Filing to erect an 18 story mixed use building. Affordable housing. HUB consultation accepted on 8/17/2021.”
- Alteration, filed Jul 30, 2026, described as “Installation of temporary suspended scaffold equipment. No changes in the egress.”
- Alteration, filed Jun 12, 2026, estimated cost $4K, described as “Installation of temporary barricade as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 12, 2026, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 15, 2025, estimated cost $766K, described as “Installation of solar panels on existing roof structure. No change in egress,use, or occupancy.”
- Alteration, filed Jun 12, 2025, described as “Installation of Mult-Point suspended scaffolding as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy.”
- Alteration, filed Dec 3, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 3, 2024, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 22, 2024, described as “Installation of temporary sidewalk shed as per plans. As per plan, section of the shed is in the roadway and shall be permitted at d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Nov 22, 2024, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 18, 2024, estimated cost $1K, described as “Application for the installation and use of concrete placing boom as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Oct 16, 2024, estimated cost $1K, described as “Installation and use of temporary interior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 22, 2024, estimated cost $1K, described as “Installation and use of temporary material platform as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Jan 28, 2022, estimated cost $2K, described as “New combined automatic wet sprinkler and class I automatic wet standpipe system for a new 18-story mixed use building. Work filed in conjunction with New Building B00587387-I1”
- Alteration, filed Jan 28, 2022, estimated cost $1K, described as “Installation of temporary air-pressurized alarm system for dry standpipe system during construction in conjunction with NB# B00587387-I1”
Property taxes
- Assessment
- $3,667,500
- 2026–27 tax
- $2,889
- Market value (city estimate)
- $8,150,000
- Taxable value
- $23,223
- Assessed land
- $3,667,500
Tax breaks
- 420-c exemption, through Jun 30, 2084, about $285,978 a year below the full tax.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Kingsland Commons RD Modification (City Planning 2024K0422): Completed, filed Jun 25, 2024. Modification of a restrictive declaration to eliminate tying TCO to open space of another phase of the project
- Cooper Park Commons (City Planning 2019K0177): Zoning map change, Special permit, Zoning text change, Urban development action area, Completed, filed Jun 17, 2021, decided Jan 7, 2022. A zoning map amendment from R6 to R7-2 & R72/C2-4 overlay, a zoning text amendment to map MIH, a special permit for Large Scale General Development (LSGD), disposition of city owned property and UDAAP designation and approval to facilitate…
- GREENPOINT RENAISSANCE FAM. HEALTH (City Planning P1999K0162): Completed, decided Jun 14, 1999. UDAAP & LDA OF A VACANT CITY-OWNED BLDG IN THE FORMER*GREENPOINT HOSPITAL COMPLEX TO BE REHABBED FOR THE DEVELOP-*MENT OF A FAMILY HEALTH CENTER
- GREENPOINT NURSING HOME (City Planning P1998K0133): Completed, decided Jun 29, 1998. 97HPD007K: CONSTRUCTION OF 240 BED RESIDENTIAL HEALTH CARE FACILITY AND ADULT DAY FAC WITH 22 ACC ON SITE PARKING SPACES
- NORTHERN DAYBREAK/LISC (City Planning P1992K0030): Completed, decided Nov 7, 1991. 91-214K: ULURP-RELATED TO GUT REHAB OF AN EXISTING 3-STORY FIREPROOF BLDG TO CONSTRUCT 12 RESIDENTIAL UNITS; Additional Other #(s): 91-215K
- NEIGHBORHD WOMEN'S RENAISSANCE HSG (City Planning P1992K0029): Completed, decided Nov 7, 1991. 91-213K: ULURP-RELATED TO RENOVATE 3, VACANT BLDGS ON FORMER GREENPOINT HOSPITAL SITE TO PROVIDE 33 APTS FOR LOW-INCOME FAMILIES
- GREENPOINT MEN'S SHELTER (City Planning P1989K0566): Completed, decided Nov 16, 1989. 87-321K: EXPAND EXISTING SHELTER. TB2885. TL1.
- GREENPOINT HOSPITAL (City Planning P1983K0422): Completed, decided Oct 6, 1983. DISPOSITION OF CITY-OWNED PROPERTY,1 PARCEL
In the news
89 Maspeth Avenue Progresses In East Williamsburg, Brooklyn, New York YIMBY, Aug 27, 2026.