131 Morgan Avenue, Brooklyn
Industrial · built 2025 · Block 3056, Lot 140.
Building permits
- New Building — Non-residential, filed Jan 15, 2024, 2 stories, described as “Proposed 2 story New Building to include accessory offices, indoor and outdoor parking for commercial vehicular storage, and commercial vehicle repair.”
- Alteration, filed Mar 20, 2025, estimated cost $1K, described as “Installation of 440 lf heavy duty sidewalk shed as per plans. No change in egress, use, or occupancy.”
- Alteration, filed Oct 18, 2023, estimated cost $5K, described as “Construction fence as per drawings during building demolition, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 18, 2023, estimated cost $5K, described as “Construction fence as per drawings during building demolition, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 18, 2023, estimated cost $5K, described as “Construction fence as per drawings during building demolition, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 12, 2023, estimated cost $10K, described as “Remove entire sprinkler system prior to demo”
- Alteration, filed Oct 12, 2023, estimated cost $15K, described as “Partial demo means & methods, including removal of portion of the building roof framing to allow salvaging of selective material & weatherproofing prior to full demolition of 1-story bldg, filed separately under B00929757-I1. No…”
- Alteration, filed Oct 12, 2023, estimated cost $10K, described as “Remove entire sprinkler system prior to demo”
- Alteration, filed Oct 12, 2023, estimated cost $10K, described as “Remove entire sprinkler system prior to demo”
- Alteration, filed Oct 12, 2023, estimated cost $15K, described as “Partial demo means & methods, including removal of portion of the building roof framing toallow salvaging of selective material & weatherproofing prior to full demolition of 1-story bldg, filed separately under B00929751-I1. No…”
- Demolition, filed Sep 21, 2023, estimated cost $200K, described as “Full demolition to a one story building”
- Demolition, filed Sep 15, 2023, estimated cost $200K, described as “Full demolition to a one story building”
- Demolition, filed Sep 15, 2023, estimated cost $200K, described as “Full demolition to a one story building”
- Alteration, filed Jul 6, 2023, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $962,550
- 2026–27 tax
- $85,125
- Market value (city estimate)
- $2,139,000
- Taxable value
- $784,710
- Assessed land
- $962,550
Zoning
M1-1: floor area ratio 0.50 built, 1.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Dec 15, 2022: $30,870,000
Open-market sales since 2016, from the Department of Finance’s sales files.