16 Melrose Street, Brooklyn
Condominium · 18 units · built 2018 · Block 3160, Lot 7504.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Dec 15, 2020, estimated cost $80K, described as “Structural framing to support the new storefront and exterior elevation, filing in conjunction with the new building filing #321468032.”
- Alteration, filed Dec 15, 2020, estimated cost $80K, described as “Structural framing to support the new storefront and exterior elevation, filing in conjunction with the new building filing #321468050”
- Alteration, filed Dec 15, 2020, estimated cost $80K, described as “Structural framing to support the new storefront and exterior elevation, filing in conjunction with the new building filing #321468041”
- Alteration, filed Nov 15, 2019, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 30, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 30, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 30, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 31, 2018, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress”
- Alteration, filed Mar 12, 2018, estimated cost $10K, described as “Installation of new sprinkler system in conjunction with DOB NB filing job# 321468041”
- Alteration, filed Mar 12, 2018, estimated cost $10K, described as “Installation of new sprinkler system in conjunction with NB DOB filing job# 321468050”
- Alteration, filed Mar 12, 2018, estimated cost $10K, described as “Installation of new sprinkler system in conjunction with NB DOB filing job# 321468032”
Property taxes
- Assessment
- $1,761,300
- Market value (city estimate)
- $3,914,001
- Taxable value
- $1,717,935
- Assessed land
- $242,100
- Assessed improvements
- $1,519,200
- Condo units with their own tax lots
- 18
Zoning
R6: floor area ratio 2.15 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Feb 18, 2026: $575,000, Apt 4F
- Dec 27, 2024: $1,262,630, Apt 2
- May 15, 2023: $609,932, Apt 4R
- Oct 12, 2022: $600,477, Apt 3F
- Oct 6, 2022: $550,000, Apt 4F
- Oct 4, 2022: $488,395, Apt 3R
- Sep 28, 2022: $520,000, Apt 3F
- Sep 23, 2022: $525,000, Apt 3F
- Sep 22, 2022: $765,000, Apt 4R
- Sep 20, 2022: $540,000, Apt 4F
The 10 most recent of 13 open-market sales since 2016, from the Department of Finance’s sales files.