66 Central Avenue, Brooklyn
Parking · Block 3163, Lot 100.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- New Building, filed Nov 19, 2024, 1 story, described as “Per HUB consultation on February 13th with Rami Bitar. NB Filed herewith for battery energy storage system (ESS) as per plans filed herewith.”
- New Building, filed Oct 15, 2024, 1 story, described as “Per HUB consultation on February 13th with Rami Bitar. NB Filed herewith for battery energy storage system (ESS) as per plans filed herewith.”
- New Building, filed Oct 11, 2024, 1 story, described as “Per HUB consultation on February 13th with Rami Bitar. NB Filed herewith for battery energy storage system (ESS) as per plans filed herewith.”
- Alteration, filed Mar 30, 2026, estimated cost $1K, described as “Curb Cut for battery energy storage system as per plans filed herewith.”
- Alteration, filed Mar 30, 2026, estimated cost $1K, described as “Curb Cut for battery energy storage system as per plans filed herewith.”
- Alteration, filed Mar 30, 2026, estimated cost $250K, described as “The scope of work is to provide a manual dry open nozzlesystem for the energy storage system at 52 central avenue”
- Alteration, filed Mar 30, 2026, estimated cost $1K, described as “Curb Cut for battery energy storage system as per plans filed herewith.”
- Alteration, filed Feb 24, 2026, estimated cost $250K, described as “Sprinkler modifications Filed herewith for battery energy storage system as per plans filed herewith.”
- Alteration, filed Jan 21, 2026, estimated cost $250K, described as “Sprinkler modifications Filed herewith for battery energy storage system as per plans filed herewith.”
- Alteration, filed Nov 4, 2025, estimated cost $13K, described as “Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.”
- Alteration, filed Nov 4, 2025, estimated cost $52K, described as “Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.”
- Alteration, filed Nov 4, 2025, estimated cost $13K, described as “Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.”
- Alteration, filed Aug 1, 2025, estimated cost $1K, described as “Electric Energy Storage Equipment filing related to NB application B01111428-I1.”
- Alteration, filed Aug 1, 2025, estimated cost $1K, described as “Electric Energy Storage Equipment filing related to NB application B01103573-I1.”
- Alteration, filed Aug 1, 2025, estimated cost $1K, described as “Electric Energy Storage Equipment filing related to NB application B01111425-I1.”
- Alteration, filed Jan 27, 2021, estimated cost $80K, described as “Replacement of two existing packaged roof top units which are10 and 12.5 tons. No change to occupancy or egress.”
Property taxes
- Assessment
- $413,550
- 2026–27 tax
- $34,914
- Market value (city estimate)
- $919,000
- Taxable value
- $321,847
- Assessed land
- $413,550
Zoning
M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Recent sales
- Nov 13, 2020: $6,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 60 CENTRAL AVE (City Planning P2006K0111): Completed, decided Oct 24, 2006. ZONING MAP AMENDMENT FOR A TWO BLOCK AREA IN BUSHWICK, BROOKLYN
- Bushwick Neighborhood Plan (City Planning 2019K0199): Completed. This is an application for a 300-block section of Bushwick, Brooklyn, Community District 4 to create a thriving and inclusive Bushwick through preservation and creation of affordable housing, targeted investments in neighborhood…