269 Central Avenue, Brooklyn
Apartment building · 72 units · built 1982 · Block 3286, Lot 1.
Building permits
- Alteration, filed Jan 19, 2024, estimated cost $15K, described as “Remove fire ,smoke & water damage walls,ceiling and floor finishes at first floor lobby and unit 1C & 1D (first floor) and 2C & 2D (second floor) only no change to layouts, structural integrity, use, egress or occupancy.”
- Alteration, filed Jan 18, 2024, estimated cost $216K, described as “Renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: provide support for new exterior boiler room pod; no changes to use, egress or occupancy.”
- Alteration, filed Jan 18, 2024, estimated cost $216K, described as “Renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: provide support for new exterior boiler room pod; no changes to use, egress or occupancy.”
- Alteration, filed Jan 17, 2024, estimated cost $16K, described as “Proposed underground utilities trench and installation for water, gas and electrical service piping between exterior elevated utility pod to buildings, and interconnecting between buildings, including one leaching unit for condensate.”
- Alteration, filed Jan 12, 2024, estimated cost $68K, described as “Proposed general site work for exterior elevated utility pod, including site demolition/clearing, layout, erosion & sediment control. No changes to use, egress, or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $90K, described as “Minor mechanical work filed in conjunction with renovation of 3-story nycha multiple dwelling throughout; no changes to use, egress, or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $737K, described as “Mechanical work in conjunction with renovation of 3-story nycha multiple dwelling throughout: provide new HVAC system from the cellar to a new prefrabicated heating boiler pod; no changes to use, egress, or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $737K, described as “Mechanical work in conjunction with renovation of 3-story nycha multiple dwelling throughout: provide new HVAC system from the cellar to a new prefrabicated heating boiler pod; no changes to use, egress, or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $90K, described as “Minor mechanical work filed in conjunction with renovation of 3-story nycha multiple dwelling throughout; no changes to use, egress, or occupancy.”
- Alteration, filed May 2, 2022, estimated cost $7K, described as “Installation of new fire / smoke damper at cellar floor in boiler room. There is no change to use, egress, occupancy, or fire protection.”
- Alteration, filed Apr 11, 2022, estimated cost $50K, described as “Restoration of water-damaged apartments as a result of inundation from hurricane ida. No change to use, egress, occupancy, or fire protection. Areas of work listed in location information and comments sections.”
- Alteration, filed Apr 11, 2022, estimated cost $50K, described as “Restoration of water-damaged apartments as a result of inundation from hurricane ida. No change to use, egress, occupancy, or fire protection. Areas of work listed in location information and comments sections.”
- Alteration, filed Apr 11, 2022, estimated cost $50K, described as “Restoration of water-damaged apartments as a result of inundation from hurricane ida. No change to use, egress, occupancy, or fire protection. Areas of work listed in location information and comments sections.”
- Alteration, filed Apr 11, 2022, estimated cost $100K, described as “Restoration of water-damaged apartments as a result of inundation from hurricane ida. No change to use, egress, occupancy, or fire protection. Areas of work listed in location information and comments sections.”
- Alteration, filed Dec 3, 2021, estimated cost $75K, described as “Replacement of existing boiler(s) as per submitted plans due to hurricane ida.”
- Alteration, filed Oct 25, 2019, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 25, 2019, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $3,870,900
- Market value (city estimate)
- $8,602,000
- Taxable value
- $0
- Assessed land
- $567,000
- Assessed improvements
- $3,303,900
Zoning
R6: floor area ratio 0.71 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.