Condominium · 115 units · built 2020 · Block 3348, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3033487501/8-palmetto-street

More construction in Bushwick: https://umarelli.org/nyc/brooklyn/bushwick.md

## Building permits

- Alteration, filed Feb 12, 2026, estimated cost $1K, described as “Illuminated non-advertising double-face projecting accessory sign - parking. No change of use, egress or occupancy.”
- Alteration, filed Aug 14, 2024, estimated cost $4K, described as “4 new sign installed as per plans; there are no changes in use or occupancy.”
- Alteration, filed Sep 14, 2022, estimated cost $1K, described as “Mechanical System Work”
- Alteration, filed Sep 14, 2022, estimated cost $1K, described as “Plumbing work”
- Alteration, filed Sep 9, 2022, estimated cost $1K, described as “Interior work supermarket build-out construction”
- Alteration, filed Aug 17, 2022, estimated cost $1K, described as “Filing for new installation of gas boilers as per plans filed herewith in conjunction with NB# 321383711. No change in egress, use or occupancy.”
- Alteration, filed Apr 4, 2022, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Mar 30, 2022, estimated cost $2K, described as “Installation of temporary debris chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 30, 2022, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 1, 2021, estimated cost $1K, described as “Installation of hanging scaffold as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 15, 2021, estimated cost $5K, described as “Installation of temporary overhead protection as per plans,shall comply with chapter # 33 of the code 2014, no changes to use, egress and occupancy.”
- Alteration, filed Jun 11, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 12, 2019, estimated cost $1K, described as “Hereby Filing new 10' curb cut on Woodbine street for parking garage entrance for NB#321383711 as shown on drawings filed herewith.”
- Alteration, filed Mar 12, 2019, estimated cost $1K, described as “Hereby Filing 15' curb cut on Woodbine Street for loading dock entrance for NB#321383711 as shown on plan filed herewith.”

## Property taxes

- Assessment: $10,400,849
- 2026–27 tax: $109,394
- Market value (city estimate): $23,113,000
- Taxable value: $920,244
- Assessed land: $654,300
- Assessed improvements: $9,746,549
- Condo units with their own tax lots: 4

## Tax breaks

- 421-a exemption, through Jun 30, 2060, about $1,156,512 a year below the full tax.

## Zoning

R6: floor area ratio 5.68 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Construction Progresses on 8 Palmetto Street in Bushwick, Brooklyn](https://newyorkyimby.com/2021/06/construction-progresses-on-8-palmetto-street-in-bushwick-brooklyn.html), New York YIMBY, Jun 23, 2021.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology