# 28 Belmont Avenue, Brooklyn

Apartment building · 475 units · built 1954 · Block 3526, Lot 21.

On Umarelli: https://umarelli.org/nyc/3035260021/28-belmont-avenue

More construction in Brownsville: https://umarelli.org/nyc/brooklyn/brownsville.md

Every lot on block 3526: https://umarelli.org/nyc/brooklyn/3526.md

## Building permits

- Alteration, filed Nov 18, 2025, estimated cost $1.8M, described as “Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 27, 2025, estimated cost $10K, described as “Installation of temporary construction fence at 335 sutter avenue, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 27, 2025, estimated cost $10K, described as “Installation of new sidewalk shed at 335 sutter avenue, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 8, 2024, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Oct 8, 2024, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Oct 8, 2024, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Apr 15, 2024, estimated cost $30K, described as “Installation of temporary pipe scaffold as per plans. Pipe scaffold shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 25, 2024, estimated cost $5K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $20K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $243K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $20K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $260K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $295K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $20K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 29, 2024, described as “Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. Suspended scaffold & material hoist shall comply with chapter 33 of the 2022 NYC bc. No change in use, egress or occupancy under this…”
- Alteration, filed Feb 29, 2024, described as “Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. Suspended scaffold & material hoist shall comply with chapter 33 of the 2022 NYC bc. No change in use, egress or occupancy under this…”
- Alteration, filed Jan 19, 2024, described as “Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. Suspended scaffold & material hoist shall comply with chapter 33 of the 2022 NYC bc. No change in use, egress or occupancy under this…”
- Alteration, filed Sep 28, 2023, estimated cost $100K, described as “Replacing gas riser for cooking (E) from cellar to the 22nd floor with new as per plans filed herewith.”
- Alteration, filed Nov 28, 2022, estimated cost $98K, described as “Existing roof perimeter guardrail to be removed and replaced with new guardrail.new concrete steps added at stair bulkhead entry doors.loose lintel replacement at bulkhead louver opening.repair of water tank room structure”
- Alteration, filed Nov 28, 2022, estimated cost $1.7M, described as “Roofing replacement and rooftop structure restoration”
- Alteration, filed Nov 28, 2022, estimated cost $1.7M, described as “Roofing replacement and rooftop structure restoration”
- Alteration, filed Nov 28, 2022, estimated cost $100K, described as “Existing roof perimeter guardrail to be removed and replaced with new guardrail.new concrete steps added at stair bulkhead entry doors.loose lintel replacement at bulkhead louver opening.”
- Alteration, filed Nov 28, 2022, estimated cost $100K, described as “Existing roof perimeter guardrail to be removed and replaced with new guardrail.new concrete steps added at stair bulkhead entry doors.loose lintel replacement at bulkhead louver opening.”
- Alteration, filed Nov 28, 2022, estimated cost $3.2M, described as “Roofing replacement and rooftop structure restoration”
- Alteration, filed Jul 6, 2022, estimated cost $2.2M, described as “Retrofit existing impervious surfaces to include green infrastructure (gi) that will manage stormwater runoff from tributary impervious surfaces. The work is part of NYC's gi program with the primary goal to reduce combined sewer overflows…”

## Property taxes

- Assessment: $15,939,450
- Market value (city estimate): $35,421,000
- Taxable value: $0
- Assessed land: $3,760,200
- Assessed improvements: $12,179,250

## Zoning

R6 (part of the lot is C4-3): floor area ratio 2.02 built, 2.43 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology