Building permits
- Alteration, filed Aug 25, 2025, estimated cost $5K, described as “Installation of pipe scaffolding per plans. Pipe scaffolding shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 30, 2025, estimated cost $12K, described as “Installation of heavy duty sidewalk shed as per plans. Shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 7, 2025, estimated cost $420K, described as “General landscaping work as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jul 23, 2024, estimated cost $24K, described as “Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.”
- Alteration, filed Jul 23, 2024, estimated cost $65K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Jun 11, 2024, estimated cost $10K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Apr 10, 2024, estimated cost $12K, described as “Mechanical work includes installation of new gas vent duct in boiler room existing chimney”
- Alteration, filed Mar 25, 2024, estimated cost $34K, described as “Scope of work includes the replacement of gas boilers and associated piping and ductwork.”
- Alteration, filed Mar 11, 2024, estimated cost $172K, described as “Facade repairs. No change in egress, use or occupancy.”
- Alteration, filed Oct 31, 2023, estimated cost $1.1M, described as “Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes. Additional ground level hardscape repairs and improvements as needed per plans.”
- Alteration, filed Sep 4, 2023, estimated cost $5K, described as “Structural work for replacement of steel stair in rear yard first floor level”
- Alteration, filed Oct 9, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Property taxes
- Assessment
- $609,750
- Market value (city estimate)
- $1,355,000
- Taxable value
- $0
- Assessed land
- $133,650
- Assessed improvements
- $476,100
Zoning
R6: floor area ratio 3.54 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- 725 HOWARD ST (City Planning P1983K0706): Completed, decided Aug 18, 1983. UDAAP FOR NYCHA,TAPSCOTT ST REHAB PROJECT