# 190 Tapscott Street, Brooklyn

Apartment building · 27 units · built c. 1930 · Block 3549, Lot 39.

On Umarelli: https://umarelli.org/nyc/3035490039/190-tapscott-street

More construction in Brownsville: https://umarelli.org/nyc/brooklyn/brownsville.md

Every lot on block 3549: https://umarelli.org/nyc/brooklyn/3549.md

## Building permits

- Alteration, filed Aug 25, 2025, estimated cost $5K, described as “Installation of pipe scaffolding per plans. Pipe scaffolding shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 30, 2025, estimated cost $12K, described as “Installation of heavy duty sidewalk shed as per plans. Shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 7, 2025, estimated cost $420K, described as “General landscaping work as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jul 23, 2024, estimated cost $24K, described as “Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.”
- Alteration, filed Jul 23, 2024, estimated cost $65K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Jun 11, 2024, estimated cost $10K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Apr 10, 2024, estimated cost $12K, described as “Mechanical work includes installation of new gas vent duct in boiler room existing chimney”
- Alteration, filed Mar 25, 2024, estimated cost $34K, described as “Scope of work includes the replacement of gas boilers and associated piping and ductwork.”
- Alteration, filed Mar 11, 2024, estimated cost $172K, described as “Facade repairs. No change in egress, use or occupancy.”
- Alteration, filed Oct 31, 2023, estimated cost $1.1M, described as “Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes. Additional ground level hardscape repairs and improvements as needed per plans.”
- Alteration, filed Sep 4, 2023, estimated cost $5K, described as “Structural work for replacement of steel stair in rear yard first floor level”
- Alteration, filed Oct 9, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”

## Property taxes

- Assessment: $609,750
- Market value (city estimate): $1,355,000
- Taxable value: $0
- Assessed land: $133,650
- Assessed improvements: $476,100

## Zoning

R6: floor area ratio 3.54 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 725 HOWARD ST (City Planning P1983K0706): Completed, decided Aug 18, 1983. UDAAP FOR NYCHA,TAPSCOTT ST REHAB PROJECT

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
