# 728 Howard Avenue, Brooklyn

Apartment building · 22 units · built c. 1920 · Block 3550, Lot 34.

On Umarelli: https://umarelli.org/nyc/3035500034/728-howard-avenue

More construction in Brownsville: https://umarelli.org/nyc/brooklyn/brownsville.md

Every lot on block 3550: https://umarelli.org/nyc/brooklyn/3550.md

## Building permits

- Alteration, filed Jun 1, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 14, 2026, described as “Suspended Scaffold for Facade Restoration as Shown on Plans”
- Alteration, filed Mar 11, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 18, 2025, estimated cost $5K, described as “Installation of pipe scaffolding per plans. Pipe scaffolding shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 31, 2025, estimated cost $19K, described as “Installation of heavy duty sidewalk shed as per plans. Shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 23, 2024, estimated cost $45K, described as “Scope of work includes the repair and/or replacement of heating, ventilation, and air condition systems of existing building.”
- Alteration, filed Jul 23, 2024, estimated cost $137K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Jul 16, 2024, estimated cost $2.3M, described as “Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes. Additional ground level hardscape repairs and improvements as needed per plans.”
- Alteration, filed Jun 5, 2024, estimated cost $10K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Apr 10, 2024, estimated cost $10K, described as “Mechanical work includes installation of new gas vent duct in boiler room - cellar level.”
- Alteration, filed Mar 29, 2024, estimated cost $43K, described as “Scope of work includes the replacement of gas boilers and associated piping and ductwork.”
- Alteration, filed Mar 11, 2024, estimated cost $127K, described as “Facade repairs. No change in egress, use or occupancy.”
- Alteration, filed Aug 25, 2023, estimated cost $40K, described as “Structural work including SOUTH existing fire escape repairs on all levels as needed. No demolition is required. Existing elements shall be resecured to maintain structural integrity.”
- Alteration, filed Mar 31, 2021, estimated cost $5K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”

## Property taxes

- Assessment: $1,081,800
- Market value (city estimate): $2,404,000
- Taxable value: $0
- Assessed land: $56,250
- Assessed improvements: $1,025,550

## Zoning

R6: floor area ratio 5.09 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 725 HOWARD ST (City Planning P1983K0706): Completed, decided Aug 18, 1983. UDAAP FOR NYCHA,TAPSCOTT ST REHAB PROJECT

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
