- Alteration, filed Dec 4, 2025, estimated cost $200K, described as “Deluge modifications as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Dec 27, 2024, estimated cost $200K, described as “Installation of new gravity-fed stormwater retention (drywell type) system and associated overflow pipe to city combined sewer.”
- Alteration, filed Oct 14, 2024, estimated cost $20K, described as “Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.”
- Alteration, filed Jun 11, 2024, estimated cost $5.1M, described as “Perform work associated with the installation of the Battery Energy Storage System at Con Edison's Brownsville Substation. ****See comments section below for a description of the PAA being filed at this time.”
- Alteration, filed Oct 20, 2021, estimated cost $137K, described as “Replace FDC & existing underground FDC piping with new above ground 6" piping from the FDC to the fire pump room at Con Edison's Brownsville Substation.”
- Alteration, filed Jul 27, 2021, estimated cost $250K, described as “Support of excavation at con edison's brownsville as per drawings. Filing in conjunction with structural application #B00528984 on DOB now build. No change in use, egress, and/or occupancy”
- Alteration, filed Jul 27, 2021, estimated cost $100K, described as “Rebuild concrete transformer pad. Grading as shown. Installation of grounding elements for reactor.”
- Alteration, filed Apr 1, 2021, estimated cost $321K, described as “Replacement of deluge system for Transformer 4 at Con Edison's Brownsville Substation.”
Zoning
M1-4 (part of the lot is C4-3): floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.