96 New Lots Ave, Brooklyn
Condominium · 469 units · built 2018 · Block 3862, Lot 7501.
Building permits
- Alteration, filed Nov 13, 2023, estimated cost $141K, described as “Removal & storage of (1) Entry vestibule. Addition of (2) enclosed spaces. Replacement of light fixtures & new ductwork. No change of use, egress or occupancy under this applic..; Note: Constr. Work related to Tenant build out related to…”
- Alteration, filed Nov 13, 2023, estimated cost $1K, described as “Installation of new mechanical system for retail store. No change of use, egress or occupancy under this application. Note: Constr. Work related to Tenant build out related to NB#321384140”
- Alteration, filed Nov 13, 2023, estimated cost $1K, described as “Plumbing Work.Note: Constr. Work related to Tenant build out related to NB#321384140”
- Alteration, filed Aug 17, 2023, estimated cost $275, described as “Non-illuminated non-advertising accessory wall sign - 660. No change of use, egress or occupancy.”
- Alteration, filed Aug 17, 2023, estimated cost $2K, described as “Non-illuminated non-advertising accessory wall sign - ebenezer urban ministry center. No change of use, egress or occupancy.”
- Alteration, filed Jan 12, 2023, estimated cost $150K, described as “Install new boiler in existing boiler room in conjunction with community facility tenant fit out as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with B00451468”
- No Work, filed Nov 21, 2022
- No Work, filed Nov 21, 2022
- Alteration, filed Apr 22, 2021, estimated cost $687K, described as “Interior renovation of existing community facility at first floor. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $687K, described as “Interior renovation of existing community facility space at first floor. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $377K, described as “Install new sprinkler work in conjunction with interior fit out of existing community facility space. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $377K, described as “Install new sprinklers in existing community facility tenant fit out as per plans filed. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $754K, described as “Interior renovation of existing community facility space at first floor. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $754K, described as “Interior renovation and installation of new plumbing work in existing community facility at first floor. No change to use, egress, or occupancy.”
- Alteration, filed Apr 21, 2021, estimated cost $157K, described as “Structural work in relation to interior renovation of existing community facility at first floor. No change to use, egress or occupancy.”
- Alteration, filed Apr 21, 2021, estimated cost $157K, described as “Interior renovation of existing community facility at first floor. No change to use, egress, or occupancy.”
- Alteration, filed Apr 15, 2021, estimated cost $1.7M, described as “Interior renovation and fit out of existing community facility space at first floor as per plans filed. No change to use, egress, or occupancy.”
- Alteration, filed Apr 15, 2021, estimated cost $1.7M, described as “Interior renovation and fit out of existing community facility space at first floor as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321384140.”
- Alteration, filed Jun 15, 2020, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2019, estimated cost $5K, described as “Installation of sidewalk shed, plywood fence and overhead protection as per plans. Sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Aug 30, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 31, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 28, 2019, estimated cost $7K, described as “Installation of sidewalk shed as per plans. Sidewalk shed live load 300 psf shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Jan 25, 2019, estimated cost $60K, described as “Use of temporary construction fence at South building as per plans filed herewith. Filed in conjunction with NB-321189735.”
- Alteration, filed Jan 25, 2019, estimated cost $40K, described as “Use of temporary construction fence at North building as per plans filed herewith. Filed in conjunction with NB-321384140.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $33,597,900
- 2026–27 tax
- $7,339
- Market value (city estimate)
- $74,662,000
- Taxable value
- $801,356
- Assessed land
- $2,478,150
- Assessed improvements
- $31,119,750
- Condo units with their own tax lots
- 6
Tax breaks
- Nonprofit exemption (house of worship), with no end date, about $552,264 a year below the full tax.
- 420-c exemption, through Jun 30, 2079, about $3,437,047 a year below the full tax.
Zoning
R7D (part of the lot is R7A): floor area ratio 4.94 built, above the 4.66 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 27, 2019: $100,000, Apt 1, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.
In the news
Housing Lottery Launches for Ebenezer Plaza Phase 1 North at 96 New Lots Avenue in Brownsville, Brooklyn, New York YIMBY, Apr 10, 2021.