# 250 Euclid Avenue, Brooklyn

Condominium · 403 units · built 2022 · Block 4143, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3041437501/275-chestnut-street

More construction in Cypress Hills: https://umarelli.org/nyc/brooklyn/cypress-hills.md

## Building permits

- New Building — Mid-Rise, filed Jan 29, 2024, 327 units, 14 stories, described as “Construct new fourteen (14) story mixed-use building as per plans filed.”
- Alteration, filed Sep 29, 2026, estimated cost $2K, described as “Telehandler for Building Construction”
- Alteration, filed Sep 28, 2026, estimated cost $10K, described as “Concrete Silo”
- Alteration, filed Aug 20, 2026, estimated cost $10K, described as “Concrete Mixer”
- Alteration, filed Aug 20, 2026, estimated cost $10K, described as “Concrete Silo”
- Alteration, filed Aug 20, 2026, estimated cost $2K, described as “Foundation for Concrete Mixer”
- Alteration, filed Aug 20, 2026, estimated cost $5K, described as “Foundation for Concrete Silo”
- Alteration, filed Aug 19, 2026, estimated cost $1K, described as “Installation of single p/m hoist (PM2) in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Aug 18, 2026, estimated cost $2K, described as “Telehandler for Building Construction”
- Alteration, filed Aug 13, 2026, estimated cost $1K, described as “Installation of single personnel hoist (PM1) in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Jul 30, 2026, estimated cost $11.8M, described as “Pipe Scaffolding for New Building Filed under B00972461”
- Alteration, filed Jun 23, 2026, estimated cost $25K, described as “Installation of sidewalk shed and construction fence as per plans. Temporary equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 21, 2025, estimated cost $3K, described as “Erect illuminated accessory business wall sign for superfresh on chestnut street.”
- Alteration, filed Apr 21, 2025, estimated cost $5K, described as “Erect (2) illuminated wall signs, (2) non-illuminated wall signs on fulton street. Signs are accessory to superfresh supermarket.”
- Alteration, filed Apr 21, 2025, estimated cost $3K, described as “Erect illuminated accessory business wall sign for SuperFresh Supermarket on Euclid Avenue Elevation.”
- Alteration, filed Feb 15, 2024, estimated cost $40K, described as “Filing herewith interior fit out as per plans.”
- Alteration, filed May 16, 2022, estimated cost $1K, described as “Installation of single personnel/material hoist (PM3) for worker access during construction. Single p/m hoist shall comply with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed May 16, 2022, estimated cost $1K, described as “Installation of single personnel/material hoist (PM4) for worker access during construction. Single p/m hoist shall comply with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Mar 22, 2022, estimated cost $20K, described as “Installation of single personnel/material hoist (PM2) for worker access during construction. Single p/m hoist shall comply with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Mar 22, 2022, estimated cost $20K, described as “Installation of single personnel/material hoist (PM1) for worker access during construction. Single p/m hoist shall comply with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Nov 29, 2021, estimated cost $24K, described as “Installation of heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Shed to be installed on roadway. Dot permits by others.”
- Alteration, filed Oct 15, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 10, 2021, estimated cost $2K, described as “Install new standpipe, sprinkler heads and related piping on cel, 001-014 & rof as shown on drawings filed herewith. No change in use, egress or occupancy. In conjunction with NB# 321184446.”
- Alteration, filed Jun 10, 2021, estimated cost $3K, described as “Installation of three (3) new boilers in cellar, as shown on plans. No change in use, occupancy or egress. In conjunction with NB #321184446.”
- Alteration, filed May 11, 2021, estimated cost $1K, described as “Install Temporary Construction Fence as per plans filed. Filed in conjunction with NB #321184446.”

## Property taxes

- Assessment: $42,952,052
- 2026–27 tax: $204,832
- Market value (city estimate): $95,449,000
- Taxable value: $1,888,205
- Assessed land: $1,485,002
- Assessed improvements: $41,467,050
- Condo units with their own tax lots: 4

## Tax breaks

- 420-c exemption, through Jun 30, 2056, about $5,098,585 a year below the full tax.

## Zoning

M1-4/R8A: floor area ratio 4.79 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Housing Lottery Launches for 341 Units at 250 Euclid Avenue in East New York, Brooklyn](https://newyorkyimby.com/2023/06/housing-lottery-launches-for-341-units-at-250-euclid-avenue-in-east-new-york-brooklyn.html), New York YIMBY, Jun 24, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology