# 265 Forbell Street, Brooklyn

Public school · built 1971 · Block 4243, Lot 1.

On Umarelli: https://umarelli.org/nyc/3042430001/265-forbell-street

More construction in East New York: https://umarelli.org/nyc/brooklyn/east-new-york.md

Every lot on block 4243: https://umarelli.org/nyc/brooklyn/4243.md

## Building permits

- Alteration, filed May 30, 2024, estimated cost $20K, described as “Fn/PS214K - for temporary construction equipment submitting on behalf of contractor, related with DOB job # B00998035. No change in use, occupancy or egress”
- Alteration, filed Mar 15, 2024, estimated cost $100K, described as “Filing herewith for the installation of temporary steel frame to shore stone column for repair.”
- Alteration, filed Sep 27, 2022, estimated cost $17K, described as “Filing for support of excavation in the school yard. No change in use, egress or occupancy.”
- Alteration, filed Aug 19, 2022, estimated cost $25K, described as “Filing for amendment for approved drawing adding additional plywood fence.”
- Alteration, filed Oct 21, 2021, estimated cost $100K, described as “Installation of temporary construction equipment as indicated on plans. No change in use, egress or occupancy”
- Alteration, filed Sep 9, 2021, estimated cost $50K, described as “Installation of temporary construction equipment,fence, as indicated on plans. No change in use, egress or occupancy”
- Alteration, filed Jun 14, 2021, estimated cost $3.1M, described as “Filing herewith for accessibility upgrade for the existing building and addition of elevator and accessibility lift.”
- Alteration, filed Jun 14, 2021, estimated cost $176K, described as “Filing herewith for the mechanical work related to the accessibility upgrade of the existing space.”
- Alteration, filed Jun 14, 2021, estimated cost $339K, described as “Filing herewith for Plumbing infrastructure renovations and additions as required for toilet rooms, drinking fountains, roof drains and associated pipings.”
- Alteration, filed Jun 11, 2021, estimated cost $84K, described as “Installation of stormwater management system (subsurface retention) per dep on-site public property green infrastructure retrofit contract, no change to use, egress or occupancy.”
- Alteration, filed Jun 11, 2021, estimated cost $10K, described as “Plumbing work associated with the installation of stormwater management system (subsurface retention) per dep on-site public property green infrastructure retrofit contract, no change to use, egress or occupancy.”

## Property taxes

- Assessment: $7,353,000
- Market value (city estimate): $16,340,000
- Taxable value: $0
- Assessed land: $936,000
- Assessed improvements: $6,417,000

## Zoning

R4: floor area ratio 0.81 built, 1.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
