# 696 Stanley Avenue, Brooklyn

Other · built 1950 · Block 4375, Lot 50.

On Umarelli: https://umarelli.org/nyc/3043750050/696-stanley-avenue

More construction in East New York: https://umarelli.org/nyc/brooklyn/east-new-york.md

Every lot on block 4375: https://umarelli.org/nyc/brooklyn/4375.md

## Building permits

- Alteration, filed Apr 12, 2024, estimated cost $24K, described as “Filing to register one 25,000 gallon fuel oil tank and removal of four fuel oil tanks.”
- Alteration, filed Mar 4, 2024, estimated cost $500K, described as “Amended certificate of occupancy to add 15 parking spaces, and general construction and earthwork related to renovation of existing parking lot, including re-paving and installation of concrete slabs, fences and gates for waste management…”
- Alteration, filed Oct 24, 2023, estimated cost $40K, described as “Curb cut application filed for 30 lf including splays per dot standard; no change in use group, egress or occupancy.”
- Alteration, filed Oct 24, 2023, estimated cost $20K, described as “Curb cut application filed for 30 lf including splays per dot standard; no change in use group, egress or occupancy.”
- Alteration, filed Oct 24, 2023, estimated cost $20K, described as “Curb cut application filed for 23LF including splays per dot standard; no change in use group, egress or occupancy.”
- Alteration, filed Oct 13, 2023, estimated cost $75K, described as “Installation of storm drainage piping, 2 area drains and 1 manhole. All storm drainage to tie into existing on-site drainage. No new connection to dep sewers. No change to use, egress or occupancy.”
- Alteration, filed Jan 20, 2023, estimated cost $700K, described as “Replace gas/oil burners on existing boilers.”
- Alteration, filed Jan 19, 2023, estimated cost $100K, described as “Replacement gas oil burners on existing boilers and connect to existing gas piping.”
- Alteration, filed Aug 2, 2022, estimated cost $7K, described as “Installation of temporary overhead protection as per drawings. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 2, 2022, estimated cost $6K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 29, 2022, estimated cost $60K, described as “Limited exterior repair and roof replacement including brick replacement, removal of existing metal railing & replacement w/ new steel railings, and removal/ replacement of roof access hatch. No change to use, egress or occupancy.”

## Property taxes

- Assessment: $1,336,950
- Market value (city estimate): $2,971,000
- Taxable value: $0
- Assessed land: $559,800
- Assessed improvements: $777,150

## Zoning

R5: floor area ratio 0.23 built, 1.50 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
