30 Inspiration Lane, Brooklyn
Condominium · built 2024 · Block 4434, Lot 7501.
Building permits
- New Building — Mid-Rise, filed Apr 14, 2023, 386 units, 15 stories, described as “Construct new fifteen (15) story mixed use building as per plans filed”
- Alteration, filed Oct 8, 2026, estimated cost $7K, described as “Temporary tents for a ribbon cutting ceremony. Removed at the end of the programming. No changes to use, occupancy or egress.”
- Alteration, filed May 6, 2026, estimated cost $6K, described as “This application is filed for temporary use permit for a sales office including model apartments pursuant to section ac 28-111 and building bulletin 2010-002.”
- Alteration, filed Oct 23, 2025, estimated cost $462K, described as “Installation of Solar PV System on roof.”
- Alteration, filed Aug 1, 2025, estimated cost $2K, described as “Use of Magni RTH 6.46 rotating telehandler to deliver materials, to be used in accordance with 2022 NYC Building Code.”
- Alteration, filed Jul 2, 2025, estimated cost $2K, described as “Temporary placement of a magni rth 6.26 sh telescopic handler to deliver material”
- Alteration, filed Apr 2, 2025, estimated cost $50K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Feb 19, 2025, estimated cost $10K, described as “Installation of temp construction office and shanties as shown per plan”
- Alteration, filed Feb 19, 2025, estimated cost $10K, described as “Installation of temporary scaffold as per plans in conjunction with NB construction. No change in use, egress or occupancy. Scaffold shall comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Dec 5, 2024, estimated cost $10K, described as “Bldg# 2: heavy duty sidewalk shed during NB const, filed sep #B00851722. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 5, 2024, estimated cost $10K, described as “Bldg# 1: heavy duty sidewalk shed during NB const, filed sep #B00851722. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 8, 2024, estimated cost $1K, described as “Install fence as per plans filed”
- Alteration, filed Dec 19, 2023, estimated cost $497K, described as “Installation of solar panel system as per plans filed”
- Alteration, filed Apr 24, 2023, estimated cost $1K, described as “Cubr cut application”
- Alteration, filed Apr 24, 2023, estimated cost $1K, described as “Installation of Curb Cut on Pennsylvania Avenue”
- Alteration, filed Apr 24, 2023, estimated cost $1K, described as “Filing herewith alteration application for sitework as per plans filed”
Property taxes
- 2026–27 tax
- $3,404,520
- Market value (city estimate)
- $66,007,000
- Taxable value
- $27,542,698
- Condo units with their own tax lots
- 2
Zoning
R7-2: floor area ratio 4.21 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
In the news
Innovative Urban Village Phase 1A Reaches Completion At 30 Inspiration Lane In East New York, Brooklyn, New York YIMBY, Oct 19, 2026.