# 30 East 98th Street, Brooklyn

Single-Room Occupancy · built c. 1931 · Block 4600, Lot 17.

On Umarelli: https://umarelli.org/nyc/3046000017/30-east-98-street

More construction in Flatbush: https://umarelli.org/nyc/brooklyn/flatbush.md

Every lot on block 4600: https://umarelli.org/nyc/brooklyn/4600.md

## Building permits

- Alteration, filed Mar 18, 2021, estimated cost $4K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
- Alteration, filed Oct 13, 2020, estimated cost $12K, described as “Alteration type 3 - construction equipment - supported scaffold: to be erected around designated building perimeter under construction. No change in occupancy or egress under this application. Needle beam system used along designated…”
- Alteration, filed Aug 20, 2020, estimated cost $5K, described as “Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Dec 18, 2019, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 14, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 27, 2019, estimated cost $5K, described as “Herewith to propose temporary 8' high wood construction fence. No changes in occupancy, use, group or egress under this application.”

## Building history

- Major Renovation — Hotel, filed Jan 11, 2018, signed off Apr 28, 2023, 63 hotel rooms added, 4 stories, described as “This application is filed for conversion of transient hotel from existing warehouse with vertical extension.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $1,881,900
- 2026–27 Tax: $75,684
- Market value (city estimate): $4,182,000
- Taxable value: $1,466,616
- Assessed land: $223,200
- Assessed improvements: $1,658,700

## Tax breaks

- ICAP Abatement, ended Jun 30, 2025, a $83,576 credit this tax year.

## Zoning

C8-2: floor area ratio 2.20 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 6, 2017: $3,200,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
