750 Utica Ave, Brooklyn
Vacant land · Block 4655, Lot 9.
Building permits
- New Building, filed Mar 21, 2024, 1 story, described as “Proposed 400 SF kiosk building accessory to the automotive service station.”
- Alteration, filed Feb 8, 2025, estimated cost $5K, described as “Installation of 90' new sidewalk shed as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Dec 31, 2024, estimated cost $3K, described as “Installation of (2) BJ's Gas signs on the canopy. No change in use, egress or occupancy.”
- Alteration, filed Dec 3, 2024, estimated cost $10K, described as “Installation of new standby natural gas generator. No change in use, egress or occupancy.”
- Alteration, filed Jan 12, 2024, estimated cost $225K, described as “Filing this P1 post approval amendment for the Installation of underground motor fuel storage tanks as depicted in plans. No change in use, egress or occupancy. Support of Excavation filed under subsequent document by Applicant responsible…”
- Alteration, filed Dec 21, 2023, estimated cost $5K, described as “Installation of 30' curb cut as indicated on plans. No change in use , egress or occupancy.”
- Alteration, filed Dec 21, 2023, estimated cost $10K, described as “Installation of 183' x 25' canopy over fuel dispensing islands. No change in use, egress or occupancy.”
- Demolition, filed May 19, 2023, estimated cost $25K, described as “Proposed demolition of existing 1-story 2,621 SF commercial building.”
- Alteration, filed May 17, 2023, estimated cost $100K, described as “Removal of (3) 4000-gallon, (3) 6000-gallon & (1)-550 gallon underground storage tanks with associated piping, islands and dispensers. No change in use, egress or occupancy.”
- Alteration, filed May 15, 2023, estimated cost $3K, described as “Installation of construction fence as depicted in plans. No change in use, egress or occupancy.”
- Alteration, filed May 15, 2023, estimated cost $3K, described as “Use of Mechanical Construction Equipment to lift, hoist and move material, earth and personnel on site. No change in use, egress or occupancy.”
- Demolition, filed May 8, 2023, estimated cost $25K, described as “Proposed demolition of existing 2 story (5421 sf) building.”
- Alteration, filed Apr 12, 2023, estimated cost $4K, described as “Remove existing steel frames sign structure with sign located on the roof of the building. Remove single pole sign foundation and sign located at OSP. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $409,500
- 2026–27 tax
- $44,423
- Market value (city estimate)
- $910,000
- Taxable value
- $409,500
- Assessed land
- $409,500
Zoning
C8-1: floor area ratio 0.00 built, 1.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.