1275 Linden Boulevard, Brooklyn
Hospital · built 1961 · Block 4718, Lot 1.
Building permits
- Alteration, filed Nov 11, 2026, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Dec 18, 2025, estimated cost $11.1M, described as “Snapper 5:: Modifications of interior partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only.”
- Alteration, filed Sep 4, 2025, estimated cost $300K, described as “Install one high pressure boiler in trailer and oil tank during hospital boiler plant renovation.”
- Alteration, filed Mar 5, 2025, estimated cost $300K, described as “Fa closet -modifications of interior partitions and finishes to modify fire alarm closets to accommodate fire alarm upgrades within the existing hospital buildings.”
- Alteration, filed Jan 8, 2025, estimated cost $525K, described as “Chc 4 mri: modification of HVAC equipment and ductwork to accommodate alterations to the mri suite as indicated on plans filed herewith.”
- Alteration, filed Jun 5, 2024, estimated cost $150K, described as “Snapper Building, 5th Floor Renovation for Step Down ICU: Interior demolition of partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only.”
- Alteration, filed Aug 7, 2023, estimated cost $300K, described as “Ep suite: modification of interior partitions and finishes to accommodate alterations to the ep suite within the existing hospital building as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 7, 2023, estimated cost $15K, described as “Installation of approximately +/-100LF - 15'W x 10'H temporary heavy duty sidewalk shed as per plans, for local law 11/98 fisp cycle 9B inspection facade repair work. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 1, 2023, estimated cost $2K, described as “Installation of sidewalk shed & construction fence for pedestrian safety during construction.sidewalk shed & construction fence shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed May 31, 2023, estimated cost $1K, described as “Installation of scaffold for worker access during construction. Scaffold shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed May 9, 2023, estimated cost $475K, described as “Brookdale Dialysis: Modification of interior partitions, finishes, structural work, HVAC equipment and ductwork to accommodate alteration to the existing dialysis suite with in the existing hospital building as per plans filed herewith.”
- Alteration, filed May 9, 2023, estimated cost $160K, described as “Brookdale Dialysis: Plumbing modifications to accommodate alterations to the dialysis suite withing the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Apr 21, 2023, estimated cost $394K, described as “CHC Radiology 4: Modification of HVAC equipment and ductwork to accommodate alterations to the radiology suite within the existing hospital buildings as per plans”
- Alteration, filed Apr 21, 2023, estimated cost $85K, described as “CHC Radiology 4: Sprinkler and plumbing modifications to accommodate alterations to the radiology suite within the existing hospital buildings as per plans”
- Alteration, filed Apr 14, 2023, estimated cost $95K, described as “CHC Radiology 4: Structural modifications to accommodate alterations to the radiology suite within the existing hospital buildings as per plans”
- Alteration, filed Apr 5, 2023, estimated cost $804K, described as “CHC Radiology 4: Modification of interior partitions and finishes to accommodate alterations to the radiology suite within the existing hospital buildings as per plans”
- Alteration, filed Nov 4, 2022, estimated cost $100K, described as “Brookdale ed: structural modifications to accommodate alteration to the emergency dept. Within the existing hospital building as per plans”
- Alteration, filed Nov 4, 2022, estimated cost $5.0M, described as “Brookdale ed: modification of interior partitions and finaishes to accommodate alterations to the existing emergency dept. With the existing hospital building.”
- Alteration, filed Nov 4, 2022, estimated cost $1.1M, described as “Brookdale ed: modification of HVAC equipment and ductwork to accommodate alterations to the existing emergency dept. With the existing hospital building.”
- Alteration, filed Nov 4, 2022, estimated cost $750K, described as “Brookdale ed: plumbing and sprinkler modifications to accommodate alteration to the emergency dept. Within the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Sep 22, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 22, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $525K, described as “Chc 4 mri: modification of HVAC equipment and ductwork to accommodate alterations to the mri suite as indicated on plans filed herewith.”
- Alteration, filed Aug 23, 2022, estimated cost $39K, described as “Chc 4 mri: sprinkler and plumbing modifications to accommodate alterations to the mri suite as indicated on plans filed herewith.”
- Alteration, filed Mar 17, 2022, estimated cost $43K, described as “Chc 4 mri -modification of interior partition and finishes to accommodate alterations for the mri suite as indicated on plans filed herewith”
19 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $60,791,850
- Market value (city estimate)
- $135,093,000
- Taxable value
- $0
- Assessed land
- $1,485,000
- Assessed improvements
- $59,306,850
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $6,594,700 a year below the full tax.
Zoning
R6: floor area ratio 5.03 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.