451 Clarkson Avenue, Brooklyn
Hospital · built c. 1930 · Block 4829, Lot 1.
Building permits
- Alteration, filed Oct 15, 2026, estimated cost $9.0M, described as “KCH L&D: New enlargement and modifications of interior and exterior partitions to accommodate alterations for the new labor and delivery suite as per plans.”
- Alteration, filed Jun 10, 2026, estimated cost $800K, described as “Installation of stormwater management system (subsurface detention tanks) per dep private property green infrastructure retrofit incentive program. No change to use, egress, or occupancy.”
- Alteration, filed Oct 30, 2025, estimated cost $275K, described as “Renovations of CT room S1N60A per plans filed herewith, No change to use, egress or occupancy”
- Alteration, filed Oct 29, 2025, estimated cost $2.9M, described as “Removal and installation of interior non-bearing partitions, and related finishes as per drawings filed herewith. No change to egress, occupancy or use.”
- Alteration, filed Sep 30, 2025, estimated cost $57K, described as “Interior renovations of medical space as per plans filed herewith, No change to use, egress or occupancy”
- Alteration, filed Nov 18, 2024, estimated cost $164K, described as “Temporary netting system at facade as per drawings. Netting system shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 16, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 14, 2024, estimated cost $1.0M, described as “Kings County Hospital, Bldg P & B connecting pedestrian bridge demo at 4th floor per the plans filed including: Bridge demo, facade panel cladding at P-bldg, masonry wall, railing, roofing & install parapet section on B bldg. Repair…”
- Alteration, filed Feb 12, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Oct 4, 2023, estimated cost $782K, described as “Propose to file for support of excavation. No change in use, egress or occupancy.”
- Alteration, filed Nov 4, 2022, estimated cost $428K, described as “Remove and install new ductwork, AHU and chiller as per plans filed herewith for the O.R. on partial 2nd floor, C Building, in the existing hospital as per plans filed herewith.”
- Alteration, filed Nov 3, 2022, estimated cost $62K, described as “Related mechanical work in Building R integration of behavioral health: duct and insulation, air terminal, air outlet, pre-balancing, testing & balancing of air and hot water, integrating existing controls and providing new controls”
- Alteration, filed Nov 3, 2022, estimated cost $91K, described as “R Bldg Int. of BH: Removal & relocation of existing domestic water piping(cold water, hot water, supply, hot water return).Installation of new plumbing fixtures & associated piping, valves, insulation etc... new plumbing to be connected to…”
- Alteration, filed Nov 3, 2022, estimated cost $16K, described as “R Bldg Integration of BH: Demolition of existing sprinklers & associated sprinkler branch piping in space back to nearest active main/branch interval. Installation of new sprinklers and associates branch piping. New sprinkler piping…”
- Alteration, filed Nov 2, 2022, estimated cost $175K, described as “New express care unit: mechanical modification”
- Alteration, filed Oct 3, 2022, estimated cost $37K, described as “New express care unit: plumbing modifications/installation”
- Alteration, filed Oct 3, 2022, estimated cost $1.8M, described as “New express care unit: partition changes, doors , finishes, ceilings”
- Alteration, filed Oct 3, 2022, estimated cost $707K, described as “Division of a large open room into 13 rooms on the first floor of the R building of Kings County Hospital Center. The new space is inclusive of 4 exam rooms, 3 offices, a conference room, a waiting room, an ADA rest room, 2 storage rooms &…”
- Alteration, filed Oct 3, 2022, estimated cost $27K, described as “New express care unit: sprinkler installation for fit out”
- Alteration, filed Sep 27, 2022, estimated cost $120.0M, described as “Herewith filing to install stea &conde. Piping from mer ECW39 to pump and tank room ECW39.2.inst. High to med.pressure steam reduc station and highto low press. Steam reducistation in pump and tank room ECW38Dis.& rem med & low press steam…”
- Alteration, filed Aug 4, 2022, estimated cost $35K, described as “Replacement of 10 ton unit on the roof. No change to egress, use, or occupancy.”
- Alteration, filed May 5, 2022, estimated cost $814K, described as “Empty purge, clean remove & dispose of one (1) 2,500-galon ust & associated piping & components. Install in-kind one (1) new 2,500-galon biodiesel motor fuel ust, piping fillboxes, veeder-root tls-450 plus, dispenser & accessories for a…”
- Alteration, filed Mar 29, 2022, estimated cost $504K, described as “Remove/ replace sprinklers with new heads and piping; install temporary sprinkler protection as per plans. Remove plumbing fixtures and install newon 2nd flor. install med medical gas piping cellar through 2nd floor.”
- Alteration, filed Mar 24, 2022, estimated cost $744K, described as “Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy.”
- Alteration, filed Mar 23, 2022, estimated cost $81K, described as “Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof.”
30 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $145,664,100
- Market value (city estimate)
- $323,698,000
- Taxable value
- $0
- Assessed land
- $12,638,250
- Assessed improvements
- $133,025,850
Zoning
R5: floor area ratio 1.69 built, above the 1.50 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- KINGS COUNTY HOSPITAL CENTER/C-O-P (City Planning P1998K0242): Completed, decided Jul 6, 1998. DISPOSITION OF THE PARCEL TO DASNY VIA A LONG TERM SUBLEASE*& A SUBSEQUENT DISPO TO THE NYCHCC VIA LONG TERM SUBLEASE