2101 Church Avenue, Brooklyn
Commercial · built c. 1928 · Block 5082, Lot 55.
Building permits
- Alteration, filed Apr 7, 2026, estimated cost $400, described as “Non-illuminated non-advertising double-sided projecting accessory sign replacing sign permitted under job# B01208974 - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed May 27, 2025, described as “Illuminated non-advertising double-sided projecting accessory sign - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed May 27, 2025, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed May 27, 2025, estimated cost $4K, described as “Illuminated non-advertising accessory wall sign - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed Apr 28, 2025, estimated cost $20K, described as “Add/relocate fire sprinklers for new tenant fit-out (Wells Fargo Bank)”
- Alteration, filed Feb 6, 2025, estimated cost $234, described as “Erect illuminated starbuck disk logo not within view of arterial highway or public park 1/2 acrre or more no change in use egress or occupancy”
- Alteration, filed Feb 6, 2025, estimated cost $2K, described as “Erect illuminated channel letterset to read "starbucks" not within view of arterial highway or public park 1/2 acre or more. No change in use egress or occupancy”
- Alteration, filed Feb 4, 2025, estimated cost $616K, described as “Fit out of existing tenant space. Non-Bearing Interior Partitions & Minor exterior renovations for ATM access as per plans. There will be no change in use, egress, or occupancy.”
- Alteration, filed Oct 22, 2024, estimated cost $2K, described as “Erect an illuminated accessory business raceway wall sign 1 @church avenue elevation view, no change in use, egress or occupancy”
- Alteration, filed Aug 7, 2024, estimated cost $650K, described as “Tenant build out for a new fine/fast casual restaurant with dine in and take away services. No change to use, occupancy, or egress.”
- Alteration, filed May 22, 2024, estimated cost $10K, described as “Installation of a new 3" domestic water service with a new 3" RPZ.”
- Alteration, filed May 21, 2024, estimated cost $5K, described as “Application is filed for a temporary fence”
- Alteration, filed May 20, 2024, estimated cost $237K, described as “Application filed for new duct work all as per plans. All other MS work filed under B01026403. No change to use egress or occupancy.”
- Alteration, filed May 20, 2024, estimated cost $68K, described as “Application is filed for new plumbing and sprinkler work all as per plans. No change to use egress or occupancy.”
- Alteration, filed May 20, 2024, estimated cost $817K, described as “Filing for build out of newly demised (3) retail spaces [er plans. No change to use, egress, or occupancy.”
- Alteration, filed May 20, 2024, estimated cost $5K, described as “Application filed for SP modification of existing SP system. Relocate / install new heads within newly demised (3) retail tenant space. No change to use, egress or occupancy”
- Alteration, filed May 20, 2024, estimated cost $30K, described as “Application filed for (5) new restrooms for (3) retail tenants gas piping off existing gas meter for tenant a HVAC units new waste lines for each tenants. No change to use, or gress”
- Alteration, filed May 20, 2024, estimated cost $296K, described as “Interior renovation minor load non bearing partitions, and removal of storefront. No change in use, egress, or occupancy”
- Alteration, filed Apr 12, 2024, estimated cost $456K, described as “Application filed for change of occupancy & egress, storefront, change one retail tenant to three retail tenants via demising walls. New entrances provided for separate retail spaces created.”
- Alteration, filed Mar 29, 2022, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 19, 2021, estimated cost $90K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 6, 2021, estimated cost $525K, described as “Structural work inclusive of floor reinforcement, in-fill, and elevator shaft as per plans filed.”
- Alteration, filed May 5, 2021, estimated cost $187K, described as “Installation of sprinkler heads with related piping; connect to existing sprinkler system. Installation of Fire Hose Racks with related standpipe piping; connect to existing standpipe system.”
- Alteration, filed May 5, 2021, estimated cost $230K, described as “Installation of plumbing fixtures with related waste and supply piping as per plans filed herewith.”
- Alteration, filed May 5, 2021, estimated cost $840K, described as “Installation of mechanical piping and duct work for HVAC and refrigeration.”
11 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Nov 10, 2020, signed off Dec 5, 2022
- Alteration, filed Dec 31, 2001, signed off Jun 20, 2016, described as “Convert existing theatre to retail stores as shown; construct interior partitions; install plumbing fixtures and related piping as shown on drawings filed herewith.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $4,927,500
- 2026–27 Tax
- $345,936
- Market value (city estimate)
- $10,950,000
- Taxable value
- $3,185,711
- Assessed land
- $352,800
- Assessed improvements
- $4,574,700
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2032, about $135,289 a year below the full tax.
Zoning
C4-4A: floor area ratio 2.04 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Flatbush Avenue BID Expansion (City Planning 2023K0228): Business Improvement District, Completed, filed Dec 14, 2022, decided Feb 20, 2024. An application from the Department of Small Business Services (SBS) to expand and amend the Flatbush Avenue Business Improvement District in Community Districts 9 and 14 of Brooklyn. (The map below shows the approximate boundary; Please…