Building permits
- Alteration, filed Jun 29, 2026, estimated cost $10K, described as “Installation of new sidewalk shed for ps 139K at 330 rugby road, brooklyn in conjunction with alt# B00984049 as indicated on plans.”
- Alteration, filed Apr 30, 2026, estimated cost $10K, described as “Installation of temporary construction fence for ps 139K at 330 rugby road, brooklyn in conjunction with alt# B00984049 as indicated on plans.”
- Alteration, filed Apr 30, 2026, estimated cost $10K, described as “Installation of pipe scaffold for ps 139K at 330 rugby road, brooklyn in conjunction with alt# B00984049 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Feb 12, 2024, estimated cost $20K, described as “K139, installation of a 10,000-gallon #4 fuel oil storage tank connected to the existing oil pump set in the boiler room of the building in conjunction with DOB # B00977458-I1-la submitting on behalf of contractor. No change in use,…”
- Alteration, filed Jan 3, 2024, estimated cost $30K, described as “Masonry: repair/replace damage face brick cut and repoint masonry joints provide sealant at open joints repair damaged concrete landings/steps. Stone sills/copings. Interior finishes: repair wall plaster repair ceiling plaster repaint…”
- Alteration, filed Dec 21, 2023, estimated cost $5K, described as “Proposed: installation of temporary fence associated with the temporary fuel storage tank. No change of use, egress or occupancy.”
- Alteration, filed Jul 25, 2023, estimated cost $200K, described as “Interior upgrade of auditorium including: removal and replacement of fixed auditorium seating repair and patching of existing surfaces paint gypsum board & plaster surfaces replacement of window curtains & draperies relocation of women's…”
- Alteration, filed Apr 22, 2022, estimated cost $20K, described as “Fn/PS139K - for temporary construction equipment(emergency fence) submitting on behalf of contractor, in conjunction with LLW#130340 no change in use, occupancy or egress”
- Alteration, filed Mar 31, 2022, estimated cost $20K, described as “Sh/PS139K - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with LLW#130340 no change in use, occupancy or egre”
- Alteration, filed Jan 25, 2022, estimated cost $600K, described as “Filing for excavation shoring on behalf of contractor”
- Alteration, filed Jan 24, 2022, estimated cost $10K, described as “Filing for installation of temporary construction fence on behalf of contractor”
Property taxes
- Assessment
- $10,598,400
- Market value (city estimate)
- $23,552,000
- Taxable value
- $0
- Assessed land
- $2,787,300
- Assessed improvements
- $7,811,100
Zoning
R3X: floor area ratio 1.36 built, above the 0.75 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.