# 72 Caton Place, Brooklyn

Industrial · built 2019 · Block 5322, Lot 51.

On Umarelli: https://umarelli.org/nyc/3053220051/72-caton-place

More construction in Kensington: https://umarelli.org/nyc/brooklyn/kensington.md

Every lot on block 5322: https://umarelli.org/nyc/brooklyn/5322.md

## Building permits

- Alteration, filed Jun 30, 2026, estimated cost $7K, described as “Illuminated non-advertising accessory wall sign - manhattan mini storage. No change of use, egress or occupancy.”
- Alteration, filed Jun 30, 2026, estimated cost $7K, described as “Illuminated non-advertising accessory wall sign - manhattan mini storage. No change of use, egress or occupancy.”
- Alteration, filed Oct 20, 2020, estimated cost $149K, described as “Installation of an emergency back up generator on rooftop. No change to use, egress or occupancy.”
- Alteration, filed Oct 20, 2020, estimated cost $175K, described as “Installation of (1) 400 gallon (generator fuel oil) above ground tank in cellar and (1) 168 gallon (generator fuel oil) belly tank for generator on roof top. No change to use, egress or occupancy.”
- Alteration, filed Apr 2, 2020, estimated cost $78K, described as “Installation of channel letters”
- Alteration, filed Feb 3, 2020, estimated cost $1K, described as “To install new 27.00' curb cut including (2) 2'6" splays on the south side of caton place, 94.8' west of coney island avenue”
- Alteration, filed Feb 3, 2020, estimated cost $1K, described as “To install new 30.00' curb cut including (2) 2-'6" splays on the south side of caton place, 59.8' west of coney island avenue”
- Alteration, filed Feb 3, 2020, estimated cost $1K, described as “To install new 27.00' curb cut including (2) 2'-6" splays on each side in conjunction with NB application # 3216934143, 126.8' west of coney island avenue. No change in use, occupancy or egress.”
- Alteration, filed Oct 8, 2019, estimated cost $5K, described as “Installation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Aug 30, 2019, estimated cost $627K, described as “Subsequent applicant taking responsibility for sprinkler and standpipe portion of the job. No change in use, occupancy or egress.”
- Alteration, filed May 24, 2019, estimated cost $12K, described as “Installation of sidewalk shed and overhead protection, roof protection as per plans. Sidewalk shed live load 300 psf and protection shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Jun 12, 2018, estimated cost $5K, described as “Alteration-iii application filed for installation of construction fence as per plans filed herewih.”

## Property taxes

- Assessment: $15,314,850
- 2026–27 tax: $285,922
- Market value (city estimate): $34,033,000
- Taxable value: $12,396,060
- Assessed land: $467,100
- Assessed improvements: $14,847,750

## Tax breaks

- ICAP abatement, through Jun 30, 2037, a $1,058,803 credit this tax year.

## Zoning

C8-2: floor area ratio 8.10 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jan 22, 2026: $145,523,540, 168,034 sq ft ($866 per sq ft)
- May 24, 2018: $23,000,000
- Apr 5, 2017: $15,194,971, 200 sq ft ($75,975 per sq ft)

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 364 Coney Island Avenue Rezoning (City Planning 2024K0369): Zoning map change, Zoning text change, Certification, In Public Review, filed Oct 27, 2025. A Zoning Map Amendment from C8-2 (OP) and R5B (OP) to C4-4D (OP) and a Zoning Text Amendment to Appendix F to map an MIH Area to facilitate a new 12-story plus cellar, 59,702 sq. ft. (7.2 FAR) mixed-use development including 2,872 sq. ft.…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
