Building permits
- Alteration, filed Apr 10, 2024, estimated cost $385K, described as “Installation of a delluge system for transformer # 10 at con edisons electrical sub station. No change to use, egress, or occupancy.”
- Alteration, filed Nov 17, 2023, estimated cost $1.0M, described as “Construction of proposed reinforced concrete foundation and steel support structure for new transformer #10.”
- Alteration, filed Oct 19, 2023, estimated cost $625K, described as “Installation of a delluge valve and a 6" water supply for the future transformer 10 deluge water spray system.”
- Alteration, filed Jan 21, 2022, estimated cost $300K, described as “Replace Transformer #1 deluge system at Con Edison's Besonhurst Substation.”
- Alteration, filed Nov 17, 2021, estimated cost $503K, described as “Installation of SPCC (Spill Prevention Controls & Counter-measures) improvements at Con Edison's Bensonhurst Substation. for transformer #1.”
- Alteration, filed Dec 2, 2020, estimated cost $250K, described as “Rebuild concrete transformer pad. Grading as shown. Installation of grounding elements for reactor.”
- Alteration, filed Aug 25, 2020, estimated cost $299K, described as “Installation of deluge system for Transformer #3 at Con Edison's Bensonhurst Substation. Filed in conjunction with application 322086023.”
Zoning
M1-1: floor area ratio 0.00 built, 1.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.