# 5601 16th Avenue, Brooklyn

Public school · built c. 1924 · Block 5492, Lot 1.

On Umarelli: https://umarelli.org/nyc/3054920001/5601-16-avenue

More construction in Borough Park: https://umarelli.org/nyc/brooklyn/borough-park.md

Every lot on block 5492: https://umarelli.org/nyc/brooklyn/5492.md

## Building permits

- Alteration, filed Jan 6, 2025, estimated cost $10.0M, described as “K180 : Repair, replace Roofing, Parapet walls, Bulk Head Roofs, As-Built Roofing; repair, replace, cut, point, re-point, caulk Brick, Terra Cotta, Masonry, Lime Stone Work. Reflash Roof Curbs, Roof Hatch; Repair Spalled Concrete, Painting…”
- Alteration, filed Jan 31, 2024, estimated cost $20K, described as “Soe/PS180K - for temporary support of excavation submitting on behalf of contractor, related to DOB #'s, B00688234 B00886537. No change in use, occupancy or egress”
- Alteration, filed Oct 10, 2023, estimated cost $20K, described as “Sh/PS180K - for temporary construction equipment(shed) submitting on behalf of contractor, related to DOB #'s B00680707, B00688234. No change in use, occupancy or egress”
- Alteration, filed Oct 9, 2023, estimated cost $20K, described as “Fn/PS180K - for temporary construction equipment(fence) submitting on behalf of contractor, related to DOB #'s B00680707, B00688234. No change in use, occupancy or egress”
- Alteration, filed Oct 9, 2023, estimated cost $20K, described as “Sf/PS180K - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to DOB #'s B00680707, B00688234. No change in use, occupancy or egress”
- Alteration, filed Jul 1, 2022, estimated cost $420K, described as “Supplemental cooling system for Auditorium provided by split system heat pumps.”
- Alteration, filed Mar 9, 2022, estimated cost $2.5M, described as “Full Program Accessibility Project, enlargement including new elevator and toilet rooms.”
- Alteration, filed Feb 15, 2022, estimated cost $3.6M, described as “K180 - Exterior masonry repairs, renovation of existing school building's facades and interior water damage, replacement of parapets, and roofs”

## Property taxes

- Assessment: $7,783,200
- Market value (city estimate): $17,296,000
- Taxable value: $0
- Assessed land: $2,601,000
- Assessed improvements: $5,182,200

## Zoning

R5 (part of the lot is R6): floor area ratio 2.12 built, above the 1.50 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
