2173 65th Street, Brooklyn
Apartment building · 8 units · built 2021 · Block 5550, Lot 40.
Building permits
- Alteration, filed Feb 8, 2023, estimated cost $9K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jan 3, 2023, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 7, 2022, estimated cost $30K, described as “Soe and foundation work for 4-story residential building in conjunction with bis JOB#321929703.”
- Alteration, filed Sep 7, 2022, estimated cost $30K, described as “Structural work for 4-story residential building in conjunction with bis JOB#321929703.”
- Alteration, filed Jul 15, 2020, estimated cost $3K, described as “Temporary construction fence with general construction work in conjunction with JOB#321929703. No change in use, egress or certificate of occupancy.”
- Alteration, filed Aug 16, 2019, estimated cost $5K, described as “Subsequent filing to install mechanical work in job 321929703, obtain new c of o”
Property taxes
- Assessment
- $491,400
- 2026–27 tax
- $61,125
- Market value (city estimate)
- $1,092,000
- Taxable value
- $491,400
- Assessed land
- $91,800
- Assessed improvements
- $399,600
Zoning
R6A (part of the lot is R5): floor area ratio 2.60 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Change to an earlier grant (Board of Standards and Appeals 309-09-BZIII): Change to an earlier grant, Granted, filed Nov 9, 2022, decided Feb 6, 2023. Extension of time to complete construction and obtain a Certifcate of Occupancy for a previously approved Variance that permitted a mixed use building which expired on October 30, 2022. R6A/R5/C2-3 Zoning district.
- Change to an earlier grant (Board of Standards and Appeals 309-09-BZII): Change to an earlier grant, Granted, filed Apr 20, 2018, decided Oct 30, 2018. Extension of Time to Complete Construction of a previously approved Variance (§72- 21) to permit construction of a four-story (three levels and a basement) eight-unit multiple dwelling that does not provide a required side yard, contrary…
- Variance or special permit (Board of Standards and Appeals 309-09-BZ): Variance or special permit, Granted, filed Nov 20, 2009, decided May 3, 2011. Variance (§72-21) to allow a mixed use building, contrary to lot coverage (§23-145), side yard (§35-541) and height (§35-542) regulations. R6A/C2-3 zoning district.