4012 Fort Hamilton Parkway, Brooklyn
Public school · built 2023 · Block 5587, Lot 38.
Building permits
- New Building — Non-residential, filed Oct 25, 2022, estimated cost $93.7M, 4 stories, described as “P.s. 004K: proposed a new 4-story school building.”
- Alteration, filed Feb 19, 2026, estimated cost $400K, described as “4K- PV system design & PV support system plans filed in conjunction to NB#B08023579. All as per plans filed herewith.”
- Alteration, filed Jan 16, 2026, estimated cost $400K, described as “4K---(canopy structural)--- PV system design & PV support system plans filed in conjunction to NB#B08023579 & B01294395 . All as per plans filed herewith.”
- Alteration, filed Jan 9, 2026, estimated cost $1K, described as “Installation and use of temporary knuckleboom as per plans filed herewith. No change in use egress, or occupancy.”
- Alteration, filed Nov 2, 2023, estimated cost $20K, described as “Ch/IS4K - for temporary construction equipment(chute) submitting on behalf of contractor, related to job B08023579. No change in use, occupancy or egress”
- Alteration, filed Oct 17, 2023, estimated cost $625.0M, described as “Herewith filing SOE for Detention tank and Utilities.”
- Alteration, filed Sep 19, 2023, estimated cost $20K, described as “Sh/IS4K - for temporary construction equipment (shed) on roadway, related to job B08023579. No change in use, occupancy or egress”
- Alteration, filed Sep 19, 2023, estimated cost $20K, described as “Sf/IS4K - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to job B08023579. No change in use, occupancy or egress”
- Alteration, filed Sep 19, 2023, estimated cost $20K, described as “Fn/IS4K - for temporary construction equipment(fence) submitting on behalf of contractor, related to job B08023579-I1. No change in use, occupancy or egress.”
- No Work, filed Apr 18, 2023
- No Work, filed Apr 18, 2023
- Alteration, filed Mar 13, 2023, estimated cost $1K, described as “Installation of new construction fence. In conjunction with SOE# B08024567.”
- Alteration, filed Jan 25, 2023, estimated cost $125K, described as “P.S.004K: FUEL STORAGE-Installation of Fuel Oil Transfer tank and transfer pump in Fuel Oil room at Cellar and Installation of Fuel Oil Tank (Belly tank) at generator. This application is filed in conjunction with NB application filed…”
- Alteration, filed Jan 24, 2023, estimated cost $715K, described as “P.S. 004K: PROPOSED NB-SPRINKLER AND STANDPIPE WORK. This application is filed in conjunction with the NB application which is filed under 2014 code.”
- Alteration, filed Nov 2, 2022, estimated cost $1.0M, described as “P.s. 004-k: proposed support of excavation for a new 4-story school building.”
- Alteration, filed Apr 1, 2019, estimated cost $10K, described as “Installation of sidewalk shed and pipe scaffolding as per plans. Sidewalk shed live load 300 psf and pipe scaffolding shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Oct 1, 2018, estimated cost $5K, described as “Installation of construction fence to protect site, during full demolition for entire lot, under DM #s 321790674/321790683”
Property taxes
- Assessment
- $1,640,700
- Market value (city estimate)
- $3,646,000
- Taxable value
- $0
- Assessed land
- $1,640,700
Zoning
R6: floor area ratio 3.70 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jan 13, 2022: $14,700,000
Open-market sales since 2016, from the Department of Finance’s sales files.