# 1379 51st Street, Brooklyn

Private School · built 2021 · Block 5649, Lot 46.

On Umarelli: https://umarelli.org/nyc/3056490046/1379-51-street

More construction in Borough Park: https://umarelli.org/nyc/brooklyn/borough-park.md

Every lot on block 5649: https://umarelli.org/nyc/brooklyn/5649.md

## Building permits

- No Work, filed Jun 15, 2023
- No Work, filed Jun 15, 2023
- No Work, filed Mar 14, 2023
- Alteration, filed Dec 17, 2021, estimated cost $1K, described as “Installation of temporary debris chute as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 1, 2021, estimated cost $1K, described as “Filing of New Temporary Standpipe System in Conjunction with NB Job#321380233”
- Alteration, filed Jun 3, 2021, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 3, 2021, estimated cost $1K, described as “Installation of temporary barricade as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 20, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 16, 2021, estimated cost $2K, described as “Filing of New Sprinkler & Standpipe System with FD Siamese Connection in Conjunction with NB Job#321380233”
- Alteration, filed Mar 9, 2021, estimated cost $1K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 9, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 9, 2021, estimated cost $1K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2019, estimated cost $10K, described as “Installation of sidewalk shed and pipe scaffold as per plans. Sidewalk shed live load 300 psf. All equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed May 20, 2019, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”

## Property taxes

- Assessment: $6,153,750
- Market value (city estimate): $13,675,000
- Taxable value: $0
- Assessed land: $573,750
- Assessed improvements: $5,580,000

## Tax breaks

- Nonprofit exemption (nonprofit, use planned), with no end date, about $667,559 a year below the full tax.

## Zoning

R6: floor area ratio 6.97 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 2016-4339-BZ): Variance or special permit, Granted, filed Nov 22, 2016, decided Feb 26, 2019. Variance (§72-21) to permit construction of a school (Use Group 3) (Bnos Zion of Bobov) contrary to underlying bulk requirements. R6 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology