6224 2nd Avenue, Brooklyn
Pier or dock · built c. 1931 · Block 5778, Lot 1.
Building permits
- Alteration, filed Oct 21, 2026, estimated cost $250K, described as “Herewith filing alteration co to add office uses to existing suite unit 7H only. Interior alteration for installation of non-bearing walls, doors, and floor finishes. No change in egress, only change to use and occupancy.”
- Alteration, filed Oct 8, 2026, estimated cost $1.0M, described as “Hereby filing a temporary core protection (tcp) for area ofwork during construction shown on plans. A new sp system will beinstalled as per these drawings, supplied by two (2) existingdry sprinkler valves on this level.”
- Alteration, filed Sep 21, 2026, estimated cost $1.0M, described as “Hereby filing removal of existing interior partitions on the 8th floor and HVAC equipment on the roof. no change to use, egress or occupancy”
- Alteration, filed Sep 16, 2026, estimated cost $500K, described as “Renovation of an existing historic building, under the ownership of NYC edc, to provide shellspaces for the cafe & east commissary tenant occupancy. Work includes installation of new plumbing fixtures, and related equipments-”
- Alteration, filed Sep 16, 2026, estimated cost $500K, described as “Hereby filing sprinkler modification for the Cafe & East commissary tenants”
- No Work, filed Sep 9, 2026, described as “Outdoor concert in the west parking of the Brooklyn Army Terminal.”
- Alteration, filed Sep 8, 2026, estimated cost $20K, described as “Temporary structures for TCE presents events at the Brooklyn Army Terminal parking lot outdoors. Removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed Sep 2, 2026, estimated cost $500K, described as “Hereby filing structural scope for the Cafe East Commissary tenant improvement per plans filed herewith.”
- Alteration, filed Sep 2, 2026, estimated cost $500K, described as “Renovation of an existing historic building, to provide the west commissary tenant shell - temporary heating only). The full fit-out of the space will occur under separate contractdocuments.”
- Alteration, filed Sep 2, 2026, estimated cost $505K, described as “Interior alteration to the existing space(s) at the 8TH floor of the existing commercial/industrial building. No changes proposed to the existing bulk, use, occupancy or egress of the existing building.”
- Alteration, filed Aug 11, 2026, estimated cost $5K, described as “Temporary Installations to be used on a temporary event " Hugel X Alesso". All the Installation are to be removed upon completion of the event.”
- No Work, filed Aug 11, 2026, described as “Temporary music event " Hugel x Alesso"”
- Alteration, filed Aug 6, 2026, estimated cost $20K, described as “Temporary structures for TCE presents events at the Brooklyn Army Terminal parking lot outdoors. Removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Aug 6, 2026, described as “Outdoor concert in the west parking of the Brooklyn Army Terminal.”
- Alteration, filed Jul 29, 2026, estimated cost $63K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 28, 2026, estimated cost $42K, described as “Interior grading work for FEMA wet flood proofing.”
- Alteration, filed Jul 28, 2026, estimated cost $6.1M, described as “The scope of work under this application includes excavation, trenching, and backfilling for utilities, tide gate chambers, and a sheet pile cutoff wall. Civil site work in relation to FEMA dry flood proofing”
- Alteration, filed Jul 28, 2026, estimated cost $1.0M, described as “The scope of work under this application includes new and re-routed exterior storm sewer, sanitary sewer, water service, and new tide gate chambers. Civil plumbing site work in relation to FEMA dry flood proofing project.”
- Alteration, filed Jul 24, 2026, estimated cost $115K, described as “Installation of scaffold as per drawings. Working floors el 0 and 1 (level 1-9). Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 24, 2026, estimated cost $82K, described as “Installation of scaffold as per drawings. Working floors shaft 3 (level 1 & 9), and rooftop. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 20, 2026, estimated cost $5K, described as “Temporary Installations to be used on a temporary event " Sammy Virji-2026 Tour Part I". All the Installations are to be removed upon completion of the event.”
- No Work, filed Jul 20, 2026, described as “Temporary event "Sammy Virji-2026 Tour Part I"”
- No Work, filed Jul 14, 2026, described as “Outdoor concert in the west parking of the Brooklyn Army Terminal.”
- Alteration, filed Jul 10, 2026, estimated cost $200K, described as “Installation of new footings and steel posts, new ejector pit, modifications to existing slab on grade, and infilling.”
- Alteration, filed Jun 30, 2026, estimated cost $5K, described as “Use of knuckleboom for building demolition. This filing is in conjunction with Alteration B01322968”
191 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $49,999,050
- Market value (city estimate)
- $111,109,000
- Taxable value
- $0
- Assessed land
- $17,195,400
- Assessed improvements
- $32,803,650
Zoning
M2-1: floor area ratio 2.08 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone VE, high risk from coastal flooding with waves: a 1% chance each year, base flood elevation 17 ft (NAVD88).
Board and land use applications
- HARBOR CHARLIE/SCUBA UNIT (City Planning P1997K0488): Completed, decided Jan 30, 1998. 96NYP008K: NYPD PROPOSES TO CONSTRUCT AN APPROXIMATELY 16,000 S.F. BUIL DING, A PARKING LOT AND A HELIPAD, AS WELL AS ASSOCIATED MAR INE WORK TO FACILTIATE THE SITING OF THE HARBOR CHARLIE UNIT
- BKLYN ARMY TERMINAL PARK & SAIL (City Planning P1995K0165): Completed, decided Jun 28, 1996. CERT TO SUBDIV AND FOR WATERFRONT PUBLIC ACCESS & VISUAL DOOR REQMNTS IN RELATION TO A NEW FERRY SERVICE TO DOWNTOWN & WEST MIDTOWN MANHATTAN FROM PIER 4