# 416 63rd Street, Brooklyn

Condominium · 84 units · built 2021 · Block 5809, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3058097501/416-63-street

More construction in Sunset Park: https://umarelli.org/nyc/brooklyn/sunset-park.md

Every lot on block 5809: https://umarelli.org/nyc/brooklyn/5809.md

## Building permits

- Alteration, filed Feb 19, 2026, estimated cost $25K, described as “Interior Renovation of the cellar and 1st floor for installation of temporary core sprinkler protection with 26 sprinkler heads.”
- Alteration, filed Mar 21, 2024, estimated cost $67K, described as “Herewith filing stanpipe work for the sca/synod space as per plans. No change in use, egress or occpancy.”
- Alteration, filed Sep 5, 2023, estimated cost $944K, described as “Installation and provisions of systems, equipment and services for a pre-k center, including electric cabinet unit heaters, perimeter electric wall pressed convectors,split system air-cooled heat recovery system with hot water unit,…”
- Alteration, filed Mar 1, 2023, estimated cost $1K, described as “Installation of sub-slab depressurization system in conjunction with NB 321188629”
- Alteration, filed Apr 26, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 25, 2022, estimated cost $180K, described as “Installation and use of temporary supported scaffolding as per plans filed herewith. This application is filed in conjunction with NB-321188629.”
- Alteration, filed Jan 6, 2022, estimated cost $236K, described as “Plumbing and sprinkler work for the build out of new Pre K space”
- Alteration, filed Dec 30, 2021, estimated cost $1.6M, described as “Buildout of new PreK space, interior partitions, ceiling and work per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 22, 2021, estimated cost $1K, described as “Installation and use of mobile equipment as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2021, estimated cost $1K, described as “Installation and use of telehandler as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 10, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 10, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 10, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 28, 2020, estimated cost $1K, described as “Installation of Construction Fence in conjunction with NB# 321188629.”
- Alteration, filed May 15, 2020, estimated cost $3K, described as “Installation of temporary standpipe system. Filed in conjunction with NB 321188629.”
- Alteration, filed May 7, 2020, estimated cost $3K, described as “Installation of plywood fence during building demolition, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed May 6, 2020, estimated cost $3K, described as “Installation of plywood fence during building demolition, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed May 5, 2020, estimated cost $1K, described as “Installation of Construction Fence in Conjunction with Alt1# 321191081”
- Alteration, filed Jul 25, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 25, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 7, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 7, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $4,819,950
- Market value (city estimate): $10,711,000
- Taxable value: $984,476
- Assessed land: $162,450
- Assessed improvements: $4,657,500
- Condo units with their own tax lots: 2

## Tax breaks

- 420-c exemption, through Jun 30, 2070, about $472,347 a year below the full tax.

## Zoning

R7A (part of the lot is R6B): floor area ratio 5.61 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.