6700 Shore Road, Brooklyn
Utility · Block 5835, Lot 1.
Building permits
- Alteration, filed Sep 25, 2025, estimated cost $70K, described as “Herewith filing for the placement of a temporary construction trailer as per plans. No change in use, egress, or occupancy”
- Alteration, filed Aug 21, 2025, estimated cost $60.5M, described as “Installation of a new enclosure room for MV VFDs on the main operation floor of the Pump and Powerhouse building.”
- Alteration, filed Aug 7, 2025, estimated cost $4.0M, described as “New pump and powerhouse VFD room masonry construction. Demolition and replacement/reconstruction of existing screen room concrete and steel framed floor. New pump and powerhouse and venturi chamber aluminum framed stairs and more.”
- Alteration, filed Aug 7, 2025, estimated cost $2.5M, described as “Demolition and replacement of the main sewage pumps system. Installation of new medium voltage (MV) variable frequency drives (VFD) for motor control. Demolition and replacement of exhaust fans, unit heaters, and rooftop units.”
- Alteration, filed Jul 28, 2025, estimated cost $1.8M, described as “RLCY-OH-02-J20G-F-03- Chlorination Building/Chlorine Contact Tank/Perimeter Roadway- Replace surface mounted conduit, site lighting stanchion, and replace conduit and wire”
- Alteration, filed Jun 3, 2022, estimated cost $10K, described as “PROPOSED: dismantling and removal of ABANDONDE empty steel gas tank. NO CHANGE OF USE, EGRESS OR OCCUPANCY”
- Alteration, filed Jan 9, 2020, estimated cost $792K, described as “Replace one existing sump pump and control panels. Install one new surge pump and control panels.”
- Alteration, filed Jan 9, 2020, estimated cost $2.1M, described as “Replace 2 duplex sump pumps and control panels in the Primary Tank Tunnel. Replace 4 duplex sump pumps and control panels; install 1 surge pump in the Grit and Scum Tunnel. All work is interior renovations.”
- Alteration, filed Jan 9, 2020, estimated cost $1.6M, described as “Replace 1 existing sump pump and associated controls. Install 1 new surge pump and associated controls. Relocate manual mechanical control system for MSP valve actuators and forebay sluice gate actuators.”
- Alteration, filed Aug 23, 2019, estimated cost $512K, described as “Bin #=main bldg. Install 3 removable flood barriers & reinforced knee walls. Reinforce existing walls. No change to occupancy, use or egress.”
- Alteration, filed Aug 23, 2019, estimated cost $2.1M, described as “Filed under BIN 3391506 (Owls Head Main Building). Replace 6 duplex sump pumps and control panels; install 1 surge pump. All work is interior renovations. No change to occupancy, use or egress.”
Zoning
M2-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Board and land use applications
- OWLS HEAD WATER POLLUTION PLANT (City Planning P2004K0438): Completed. 97DEP083K: MODIFICATION OF THE EXISTING FACILITES AT THE OWLS HEAD WATE R POLLUTION CONTROL PLANT