7100 Shore Road, Brooklyn
Parochial school · built 1961 · Block 5883, Lot 1.
Building permits
- Alteration, filed Oct 1, 2026, estimated cost $9K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 26, 2026, estimated cost $9K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 2, 2026, estimated cost $20K, described as “Installation of construction fence”
- Alteration, filed Jun 12, 2024, estimated cost $185K, described as “Installation of solar panels as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed May 13, 2024, estimated cost $275K, described as “Removal and installation of a/c units, ductwork, diffusers, fans and related mechanical piping as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed May 10, 2024, estimated cost $700K, described as “Filing herewith removal and installation of walls, doors and ceiling as shown on drawings. No change to use, egress or occupancy”
- Alteration, filed May 10, 2024, estimated cost $1.0M, described as “Filing herewith roof renovation as shown on drawings. No change to use, egress or occupancy”
- Alteration, filed May 7, 2024, estimated cost $15K, described as “Modification to existing plumbing system and related piping as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 2, 2023, estimated cost $3.9M, described as “Please assign to hub per consultation with scott pavan on 4/19/23. Proposed horizontal and vertical enlargement to existing school. Work on floors cel, bas, 01, rof. BSA #2025-28-bz approved 12/8/25.”
- Alteration, filed Mar 30, 2022, estimated cost $145K, described as “Installation of 2 new condensing units on the 2nd floor roof terrace, related piping and conduit from Bas-ROF and air handlers on the first floor as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 29, 2022, estimated cost $1K, described as “Cut and connect gas piping to AC units on first floor roof as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 25, 2022, estimated cost $30K, described as “Patch and repair existing roof in preparation for structural framing as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Mar 18, 2022, estimated cost $20K, described as “Installation of framing for 2 AC units on the roof as per plans filed herewith. No change to use, egress or occupancy.”
- No Work, filed Sep 3, 2019, described as “Alumni Dinner Reception”
- No Work, filed Jul 16, 2019
- Alteration, filed May 9, 2019, estimated cost $1K, described as “Hereby filing for the erection of temporary construction fence on Shore Road and Mackay Place in conjunction with ALT 1 # 321935714 as per plans filed herewith. No change in use, egress or occupancy in this application.”
- Alteration, filed Feb 15, 2018, estimated cost $1K, described as “Hereby filing to legalize curb cut on 71ST street to correct open violation #34176125Y.”
- Alteration, filed Feb 15, 2018, estimated cost $1K, described as “Hereby filing to legalize existing curb cut on narrows avenue. No change to use, egress or occupancy.”
Property taxes
- Assessment
- $16,163,550
- Market value (city estimate)
- $35,919,000
- Taxable value
- $0
- Assessed land
- $1,093,500
- Assessed improvements
- $15,070,050
Tax breaks
- Nonprofit exemption (religious school), with no end date, about $1,753,422 a year below the full tax.
Zoning
R5B (part of the lot is R6A): floor area ratio 1.84 built, above the 1.50 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 2025-28-BZ): Variance or special permit, Granted, filed Aug 15, 2025, decided Dec 8, 2025. Variance (§72-21) to permit the enlargement of an existing school contrary to underlying bulk requirements. R6A & R5B zoning districts.