Condominium · 151 units · built 2019 · Block 6471, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3064717501/2286-cropsey-avenue

More construction in Gravesend: https://umarelli.org/nyc/brooklyn/gravesend.md

## Building permits

- Alteration, filed Sep 18, 2026, described as “Installation of temporary suspended scaffolds per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- No Work, filed Sep 4, 2026
- Alteration, filed Sep 3, 2026, estimated cost $2K, described as “Proposed interior renovation on partial 3RD floor. Ceiling, flooring, partition works as per plan. No change in use, bulk, egress or occupancy.”
- Alteration, filed May 22, 2026, estimated cost $70K, described as “Proposed interior renovation on partial 1ST floor in conjunction with NB #: 320978064. Ceiling, flooring, partition works as per plan. No change in use, bulk, egress or occupancy.”
- Alteration, filed Dec 5, 2025, estimated cost $8K, described as “This filing is intended to supersede DOB#B00433544, cominstallation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code no change to use, egress or occupancy.”
- Alteration, filed Jun 10, 2024, estimated cost $2K, described as “Install illuminated wall sign (HLA2)”
- Alteration, filed Jun 10, 2024, estimated cost $2K, described as “Install awning with non-illuminated copy reading "HLA2". Copy to be 12 sq ft or less. No change to occupancy, use or egress.”
- Alteration, filed Jan 3, 2022, estimated cost $17K, described as “Installation of spyder crane in conjunction with NB 320978064. This application involves no change in use, occupancy or egress.”
- Alteration, filed Jan 3, 2022, estimated cost $17K, described as “Installation of spyder crane in conjunction with NB 320978064. This application involves no change in use, occupancy or egress.”
- No Work, filed May 27, 2021
- No Work, filed May 27, 2021
- Alteration, filed Apr 29, 2021, estimated cost $300K, described as “Herewith filing for mechanical HVAC installation as alteration job type.”
- Alteration, filed Apr 29, 2021, estimated cost $214K, described as “Herewith filing for plumbing and sprinkler installation as alteration job type.”
- Alteration, filed Feb 5, 2021, estimated cost $900K, described as “Filing for approval of interior work for educational spaces”
- Alteration, filed Nov 27, 2020, estimated cost $1K, described as “Installation of overhead protection and supported scaffold as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Oct 8, 2020, estimated cost $70K, described as “Installation of 300KW emergency generator as required by code.”
- Alteration, filed Oct 8, 2020, estimated cost $7K, described as “Installation of 300 gallon integral fuel oil tank and 75 gallon day tank for the emergency generator.”
- Alteration, filed Jan 7, 2020, estimated cost $5K, described as “Installation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed Sep 10, 2019, estimated cost $5K, described as “Installation of sidewalk shed as per plans. Sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”

## Property taxes

- Assessment: $25,680,435
- 2026–27 tax: $2,733,233
- Market value (city estimate): $57,067,531
- Taxable value: $23,870,374
- Assessed land: $2,508,313
- Assessed improvements: $23,172,122
- Condo units with their own tax lots: 215

## Zoning

R6: floor area ratio 5.88 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 6, 2026: $878,195, Apt 18-A
- Jul 16, 2026: $939,290, Apt 9-E
- Jun 16, 2026: $756,005, Apt 8-H
- May 21, 2026: $939,290, Apt 15-E
- May 15, 2026: $845,611, Apt 12-A
- May 14, 2026: $857,830, Apt 17-A
- May 11, 2026: $817,100, Apt 14-G
- Apr 15, 2026: $781,461, Apt 5-F
- Mar 26, 2026: $967,338, Apt 16-E
- Mar 12, 2026: $1,081,845, Apt 20-F

The 10 most recent of 83 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## In the news

[2300 Cropsey Avenue’s Façade Nears Completion in Gravesend, Brooklyn](https://newyorkyimby.com/2023/03/2300-cropsey-avenues-facade-nears-completion-in-gravesend-brooklyn.html), New York YIMBY, Mar 2, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology