# 245 Gravesend Neck Road, Brooklyn

Public School · built c. 1914 · Block 7123, Lot 66.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3071230066/245-gravesend-neck-road

More construction in Gravesend: https://umarelli.org/nyc/brooklyn/gravesend.md

Every lot on block 7123: https://umarelli.org/nyc/brooklyn/7123.md

## Building permits

- Alteration, filed Oct 30, 2026, estimated cost $10K, described as “Installation of pipe scaffold for ps 95K at 345 van sicklen street, brooklyn in conjunction with job # B01141768 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 30, 2026, estimated cost $10K, described as “Installation of new sidewalk shed for ps 95K at 345 van sicklen street, brooklyn in conjunction with job # B01141768 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 29, 2026, estimated cost $10K, described as “Installation of temporary construction fence in conjunction with job # B01141768-I1, B01460875-I1, B01460885-I1”
- Alteration, filed Nov 18, 2024, estimated cost $523K, described as “Masonry repair work. Partial roof replacement. Replacement of louver.”
- Alteration, filed Apr 21, 2023, estimated cost $88K, described as “Support of excavation”
- Alteration, filed Apr 20, 2023, estimated cost $19K, described as “Installing of temp. Construction fence”
- Alteration, filed Sep 16, 2022, estimated cost $15K, described as “Ps 095K, excavation and shoring to create an opening for the installation of a new concrete pit for the sump pump installation in conjunction with DOB # 322053362. No change in use, egress, or occupancy.”
- Alteration, filed Aug 16, 2022, estimated cost $446K, described as “Support of excavation”
- Alteration, filed Aug 16, 2022, estimated cost $43K, described as “Temporary construction fence”
- Alteration, filed Aug 13, 2022, estimated cost $20K, described as “Ps 095K, installation of +/- 319 linear feet of temporary 8 feet high chain link fence and +/- 56 linear feet of sidewalk shed submitting on behalf of contractor in conjunction with DOB # 322053362. No change in use, egress, or occupancy.”
- Alteration, filed Mar 14, 2022, estimated cost $424K, described as “Retrofit exist schoolyards to include green infrastructure to improve management of stormwater runoff from the tributary impervious surfaces.”
- Alteration, filed Mar 2, 2022, estimated cost $713K, described as “Auditorium renovation at the second floor.”

## Property taxes

- Assessment: $4,194,000
- Market value (city estimate): $9,320,000
- Taxable value: $0
- Assessed land: $2,164,500
- Assessed improvements: $2,029,500

## Zoning

R5: floor area ratio 0.59 built, 1.50 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
