76 Avenue V, Brooklyn
Utility · Block 7140, Lot 1.
Building permits
- Alteration, filed Mar 15, 2024, estimated cost $1.7M, described as “Replacement of Wet Well Rails at the Avenue V Pump Station.”
Building history
- Alteration, filed Mar 21, 2003, signed off May 11, 2015, described as “Partial demolition of the existing build ing structure and to reconstruc the bldgs. 1 interior modification of t he sewage pumping station 2 reconstruct the accessory generating substation 20'X 40' 3 to construct the accessory utilit…”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Zoning
R5: floor area ratio 0.00 built, 1.50 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Board and land use applications
- AVENUE V PUMPING STATION (City Planning P2006K0436): Completed. 98DEP031K: NYCDEP IS PROPOSING TO UPGRADE AND REHABILITATE THE AVENUE V PUMPING STATION IN ORDER TO MEET COMBINED SEWER OVERFLOW AB ATEMENT AND FLOW CONVEYANCE REQUIREMENTS