2295 West 11th Street, Brooklyn
Apartment building · 1,072 units · built 1956 · Block 7140, Lot 16.
Building permits
- New Building, filed Dec 19, 2023, 2 stories, described as “The proposed new building for the marlboro agricultural education center located on the nycha campus.”
- Alteration, filed Sep 23, 2026, estimated cost $330K, described as “Installation of structural framework for greenhouse as per plans.”
- Alteration, filed Jun 17, 2026, estimated cost $200K, described as “Marlboro Houses Boiler Plant Bldg#29, Repair of spalled concrete and deteriorated reinforcing steel at interior beams, walls and slabs. Installation of temporary shoring to support deteriorated beams and slabs(under separate application).”
- Alteration, filed Sep 18, 2025, estimated cost $1.5M, described as “Filing for pumps for replacement of domestic hot water system per plans filed herewith. All pl and gc work to be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Sep 18, 2025, estimated cost $320K, described as “Filing for the replacement and installation of piping, pumps, removal of hot water heating system. All ms and gc work to be filed under separate application. No change to use, egress or occupancy.”
- Alteration, filed May 20, 2025, estimated cost $800K, described as “NYCHA Marlboro House Community Center Flood Remediation Work. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.”
- Alteration, filed Dec 18, 2024, estimated cost $9K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 18, 2024, estimated cost $11K, described as “Installation of a temporary Boiler Work Platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Nov 5, 2024, estimated cost $450K, described as “Installation of temporary shoring in order to remove an underground storage tank”
- Alteration, filed Aug 13, 2024, estimated cost $1.0M, described as “Filing for pumps for replacement of domestic hot water system per plans filed herewith. All pl and gc work to be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 13, 2024, estimated cost $1.0M, described as “Filing ms for removal of existing tank room mechanical, heating, and domestic hot water system and installation of new glycol/water hydronic system and all ancillary equipment, piping, and controls. Related gc work under approved…”
- Alteration, filed Aug 13, 2024, estimated cost $800K, described as “Filing for pumps for replacement of domestic hot water system per plans filed herewith. All pl and gc work to be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 13, 2024, estimated cost $800K, described as “Filing for pumps for replacement of domestic hot water system per plans filed herewith. All pl and gc work to be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 13, 2024, estimated cost $800K, described as “Filing for pumps for replacement of domestic hot water system per plans filed herewith. All pl and gc work to be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 8, 2024, estimated cost $800K, described as “Filing for pumps for replacement of domestic hot water system per plans filed herewith. All pl and gc work to be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 8, 2024, estimated cost $800K, described as “Removal of existing tank room mechanical, heating and domestic hot water system. Installation of new hot water system and associated piping and ducts. No change in use egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $800K, described as “Removal of existing tank room mechanical, heating and domestic hot water system. Installation of new hot water system and associated piping and ducts. No change in use egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $800K, described as “Removal of existing tank room mechanical, heating and domestic hot water system. Installation of new hot water system and associated piping and ducts. No change in use egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $800K, described as “Removal of existing tank room mechanical, heating and domestic hot water system. Installation of new hot water system and associated piping and ducts. No change in use egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $800K, described as “Filing for associated pumps for replacement of domestic hot water system per plans filed herewith. All plumbing and gc work to be filed under separate application. No change to use, egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $800K, described as “Removal of existing tank room mechanical, heating and domestic hot water system. Installation of new hot water system and associated piping and ducts. No change in use egress or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $1.0M, described as “Removal of existing tank room mechanical, heating and domestic hot water system. Installation of new hot water system and associated piping and ducts. No change in use egress or occupancy.”
- Alteration, filed Jun 21, 2024, estimated cost $10K, described as “Construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 22, 2024, estimated cost $870K, described as “Filing for civil work related to concrete pad placement.”
- Alteration, filed Nov 14, 2023, estimated cost $40K, described as “Marlboro houses (building #29), the installation of temporary steam and condensate piping to connect (3) temporary boiler trailers to the existing building heating system to provide heat during the heating season. No change in use, egress,…”
36 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $33,704,550
- Market value (city estimate)
- $74,899,000
- Taxable value
- $0
- Assessed land
- $8,643,600
- Assessed improvements
- $25,060,950
Zoning
R5: floor area ratio 0.94 built, 1.50 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.