# 2475 Stillwell Avenue, Brooklyn

Public School · built c. 1931 · Block 7185, Lot 20.

On Umarelli: https://umarelli.org/nyc/3071850020/2475-stillwell-avenue

More construction in Gravesend: https://umarelli.org/nyc/brooklyn/gravesend.md

Every lot on block 7185: https://umarelli.org/nyc/brooklyn/7185.md

## Building permits

- Alteration, filed May 27, 2025, estimated cost $136K, described as “Temporary construction fence for soil remediation. No change to use, egress or occupancy under this filing.”
- Alteration, filed Jun 24, 2024, estimated cost $720K, described as “Removal of new concrete curbs, fence, concrete slabs, bleachers, long jump area, and pole vault area.”
- Alteration, filed Jan 23, 2024, estimated cost $30K, described as “Installation of temporary construction shoring for underground utility excavation in conjunction with job # B00702261& B00954299 at 64 avenue x, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy”
- Alteration, filed Nov 12, 2023, estimated cost $30K, described as “Installation of pipe scaffold for ps 721K at 64 avenue x, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Nov 9, 2023, estimated cost $20K, described as “Installation of temporary construction fence for ps ps 721K at 64 avenue x, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Nov 9, 2023, estimated cost $20K, described as “Installation of new sidewalk shed for ps ps 721K at 64 avenue x, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 18, 2023, estimated cost $2.5M, described as “Walkway and entrance canopy roof replacements, masonry repairs, masonry piers & spandrel panel replacement”
- Alteration, filed Nov 1, 2022, estimated cost $1.2M, described as “PS721K\_Remove and replace all kitchen equipment, hoods, hood ducts and Ansul system, suspended acoustical ceiling panels and grid, light fixtures, ceiling supply diffusers and return grilles, quarry floor tiles. Provide ceramic tile wall…”
- Alteration, filed Jan 26, 2022, estimated cost $5K, described as “Light duty pipe scaffold for interior renovation work of auditorium filed under DOB#322053932.”
- Alteration, filed Oct 25, 2021, estimated cost $3K, described as “Filed Herewith; 8 Foot High Construction Fence Application in conjunction with Application #322053932”
- Alteration, filed Oct 19, 2021, estimated cost $20K, described as “Submitted on behalf of contractor for the installation of temporary construction equipment (soe - using: berming/sloping/benching), in conjunction with DOB# 321068143 & 322053834, no change in use, occupancy or egress.”
- Alteration, filed Aug 25, 2021, estimated cost $850K, described as “Submitted on behalf of contractor for the installation of temporary construction equipment (fence= 7000 lf), in conjunction with DOB# 321068143 & 322053834, no change in use, occupancy or egress”

## Property taxes

- Assessment: $20,136,600
- Market value (city estimate): $44,748,000
- Taxable value: $0
- Assessed land: $4,271,400
- Assessed improvements: $15,865,200

## Zoning

R5: floor area ratio 1.05 built, 1.50 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.