# 2601 Ocean Parkway, Brooklyn

Hospital · built c. 1931 · Block 7239, Lot 1.

On Umarelli: https://umarelli.org/nyc/3072390001/2601-ocean-parkway

More construction in Ocean Parkway: https://umarelli.org/nyc/brooklyn/ocean-parkway.md

## Building permits

- Alteration, filed Aug 6, 2026, estimated cost $803K, described as “Sbh dental: modification of interior partitions and finishes to accommodate alterations to the dental suite within the existing hospital building as per plans”
- Alteration, filed Feb 17, 2026, estimated cost $273K, described as “General construction for renovation on main building 5TH floor as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Jan 28, 2026, estimated cost $535K, described as “Renovation of third floor of rbg building, convert existing x-ray space into a procedure room, existing conference room to cath lab, control room, and equipment room as shown herewith. No changes to egress, occupancy or use.,”
- Alteration, filed Apr 16, 2025, estimated cost $1.7M, described as “Proposed general construction for interior renovation on the eighth floor. All as per plans filed herewith”
- Alteration, filed Nov 4, 2024, estimated cost $3K, described as “Filing for detention tanks and associated drains & piping in conjunction to NB app # 320911171 as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Oct 30, 2024, estimated cost $125K, described as “Proposed selective removal on part of the 8th floor wing, in connection with an interior renovation at NYC H+H SOUTH BROOKLYN HEALTH HOSPITAL.”
- Alteration, filed Oct 17, 2024, estimated cost $50K, described as “Demolition of a Canopy for the Main Building of Coney Island Hospital”
- Alteration, filed Sep 11, 2024, estimated cost $844K, described as “Herewith filing general construction modifications for Out-Patient Infusion Center at South Brooklyn Health. No change in use, egress, or occupancy.”
- Alteration, filed Aug 8, 2024, estimated cost $12.0M, described as “Sbh med office: modification of interior partitions and finishes to accommodate alterations at partial 1ST floor withi the existing hospital building as per plans. Refer to alt 1 320239979 for use and egress.”
- Alteration, filed Jun 18, 2024, estimated cost $2K, described as “Construction fence as per drawings during bldg demo. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 18, 2024, estimated cost $2K, described as “Construction fence as per drawings during bldg demo. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 5, 2024, estimated cost $25K, described as “Convert standpipe to dry temporary standpipe no change to use, occupancy or egress.”
- Alteration, filed Jan 8, 2024, estimated cost $65K, described as “Abandonment of a 7500 gallon existing underground diesel storage tank”
- Alteration, filed Oct 11, 2023, estimated cost $30K, described as “Temporary overhead protection as per drawings. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 11, 2023, estimated cost $50K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 11, 2023, estimated cost $5K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 11, 2023, estimated cost $10K, described as “Temporary overhead protection during building alteration at the adjacent property (2601 ocean pway) as per drawings. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 6, 2023, estimated cost $10K, described as “Installation of 300 psf sidewalk shed, overhead protection and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Demolition, filed Jun 15, 2023, estimated cost $200K, described as “Paa application for full demolition of 1 story structure”
- Demolition, filed Jun 9, 2023, estimated cost $200K, described as “Paa application of demolition for full demolition of 5 story hammett building”
- Alteration, filed Apr 19, 2023, estimated cost $575, described as “BB034: install non-illuminated pedestrian directory panel mounted on grade. (NYC health+ hospitals south brooklyn health)”
- Alteration, filed Apr 19, 2023, estimated cost $575, described as “CC003: install non-illuminated pedestrian directory panel mounted on grade. (NYC health+ hospitals south brooklyn health)”
- Alteration, filed Apr 19, 2023, estimated cost $575, described as “BB002: install non-illuminated pedestrian directory panel mounted on grade. (NYC health+ hospitals south brooklyn health)”
- Alteration, filed Apr 19, 2023, estimated cost $3K, described as “Ee: install illuminated sign mounted on ramp wall (emergency)”
- Alteration, filed Apr 19, 2023, estimated cost $575, described as “CC021: install non-illuminated pedestrian directory panel mounted on grade. (NYC health+ hospitals south brooklyn health)”

38 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3072390001/2601-ocean-parkway.

## Property taxes

- Assessment: $127,909,350
- Market value (city estimate): $284,243,000
- Taxable value: $0
- Assessed land: $8,667,450
- Assessed improvements: $119,241,900

## Zoning

R4: floor area ratio 2.38 built, above the 1.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NAVD88).

## Board and land use applications

- CONEY ISLAND HOSPITAL EMER. DEPT. (City Planning P2011K0147): Completed, decided Apr 15, 2011. TO EXPAND THEIR EMERGENCY DEPT. WITH A SMALL ONE STORY ADDITION TO THE EXISTING MAIN BUILDING
- CONEY IS HOSPITAL MAJOR MODERN PROJ (City Planning P2002K0138): Completed, decided Feb 7, 2002. AUTH TO CONSTRUCT A NEW 7-STORY INPATIENT BLDG WITH APPROX\*205 BEDS & WILL CONNECT TO THE EXIST MAIN BLDG IN THE SPEC\*OCEAN PARKWAY DIST

## In the news

[After Pandemic Delays, Coney Island Hospital Expansion Moves Forward](https://www.brownstoner.com/development/coney-island-hospital-expands-new-tower-flood-barriers-pandemic-2619-ocean-parkway/), Brownstoner, Apr 28, 2021.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology