# 2202 Avenue V, Brooklyn

Public school · built c. 1924 · Block 7381, Lot 201.

On Umarelli: https://umarelli.org/nyc/3073810201/2224-east-23-street

More construction in Sheepshead Bay: https://umarelli.org/nyc/brooklyn/sheepshead-bay.md

## Building permits

- New Building — Non-residential, filed Oct 24, 2022, estimated cost $50.0M, 5 stories, described as “P.s. 206-k: proposed new 5-story school building.”
- Alteration, filed Sep 2, 2026, estimated cost $20K, described as “Scaffold for facade work for new building addition in conjunction with job #B08024281.”
- Alteration, filed Aug 26, 2025, estimated cost $2K, described as “Magni telehandler used to hoist and load formwork, rebar, wire mesh, material & concrete trowel machines”
- Alteration, filed Apr 1, 2025, estimated cost $10K, described as “PS 206K - Herewith filing Temp Standpipe application for new School building.”
- Alteration, filed Dec 27, 2024, estimated cost $59.6M, described as “Herewith filing SOE FOR new School building B08023268-I1”
- Alteration, filed Nov 8, 2024, estimated cost $10K, described as “Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: B08023268, and related application: VT - B01071325-P1”
- Alteration, filed Oct 17, 2024, estimated cost $5K, described as “Installation and use of temporary supported scaffold construction equipment in elevator shaft as per plans filed herewith.”
- Alteration, filed Jul 17, 2024, estimated cost $100K, described as “Sidewalk shed for protection of public in conjunction with job # B08023268, B00891749, & B08024281”
- Alteration, filed Jul 17, 2024, estimated cost $100K, described as “Scaffold for facade work for new building addition in conjunction with job # B08023268”
- Alteration, filed May 13, 2024, estimated cost $59.6M, described as “Herewith filing soe for NB B08023268-I1 - briefly, the scope of work is to provide a support of excavation design for the proposed building at the referenced address”
- Alteration, filed Apr 2, 2024, estimated cost $20K, described as “Fn/PS206K - for temporary construction equipment(fence) submitting on behalf of contractor, related to job B08023268, B08024281 no change in use, occupancy or egress”
- Alteration, filed Oct 27, 2023, estimated cost $165K, described as “The scope of work includes the installation of a supplemental cooling system for the 1ST floor auditorium.”
- Alteration, filed Oct 27, 2023, estimated cost $240K, described as “The scope of work includes the installation of a supplemental cooling system for the 1st floor cafeteria.”
- Alteration, filed Aug 14, 2023, estimated cost $31K, described as “Support of excavation stormwater retention system in conjunction with DOB now JOB#B08000963. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 8, 2023, estimated cost $5K, described as “Installation of 8' high temporary construction fence”
- Alteration, filed Jun 28, 2023, estimated cost $505K, described as “Selective removal exist. walls., partitions, doors, finishes, equip., and misc. const. Provide new conc. platforms, doors, frames and hardware, drywall part., ceiling, wall and floor finish, room signage, Auditorium seating HC Platform…”
- Alteration, filed Nov 1, 2022, estimated cost $1.0M, described as “P.s. 206-k: proposed sprinkler and standpipe system for a new 5-story school building.”
- Alteration, filed Oct 25, 2022, estimated cost $1.0M, described as “P.S. 206-K: connecting bridge between existing and proposed buildings.”
- No Work, filed Oct 24, 2022
- Alteration, filed Oct 11, 2022, estimated cost $100K, described as “P.S. 206-K: New 24-ft wide curb cut for relocated DSNY compactor area.”
- Alteration, filed Oct 6, 2022, estimated cost $500K, described as “P.S. 206-K: selective removals and construction of new exit stair and door, roof repairs.”

## Property taxes

- Assessment: $6,635,700
- Market value (city estimate): $14,746,000
- Taxable value: $0
- Assessed land: $1,581,750
- Assessed improvements: $5,053,950

## Zoning

R4: floor area ratio 1.32 built, above the 1.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## In the news

[Permits Filed for 2224 East 23rd Street in Sheepshead Bay, Brooklyn](https://newyorkyimby.com/2024/09/permits-filed-for-2224-east-23rd-street-in-sheepshead-bay-brooklyn.html), New York YIMBY, Sep 12, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology