2859 Flatbush Avenue, Brooklyn
Car dealer · built 2016 · Block 8591, Lot 150.
Building permits
- New Building, filed Nov 3, 2022, estimated cost $1.3M, 2 stories, described as “Filing herewith drawings indicating the construction of new 2 story building.”
- Alteration, filed Sep 24, 2025, estimated cost $98K, described as “Installation of solar panels on existing roof. No change in use, occupancy, or egress. No change in bulk”
- Alteration, filed Jan 28, 2025, estimated cost $5K, described as “Illuminated non-advertising accessory wall sign - in property lines - cadillac. No change of use, egress or occupancy.”
- Alteration, filed Jan 28, 2025, estimated cost $3K, described as “Illuminated non-advertising accessory wall sign - in property lines - cadillac. No change of use, egress or occupancy.”
- Alteration, filed Sep 25, 2024, described as “IRA application filed herein for inspection”
- Alteration, filed Aug 29, 2024, estimated cost $64K, described as “Filing herewith Site Development Work as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 17, 2024, estimated cost $325K, described as “Install new HVAC system as per plans. Nochange in use, occupancy, or egress.”
- Alteration, filed Mar 28, 2024, estimated cost $91K, described as “Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 4 GPS antennas and 1 platform with related cabinets. Related conduits on OSP and service connection on 2nd floor.”
- Alteration, filed May 24, 2023, estimated cost $20K, described as “Filing herewith temporary construction fence as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 2, 2022, estimated cost $240K, described as “Filing herewith foundation work related to NB# B08021093-I1. No change to use, egress or occupancy.”
- Alteration, filed Nov 2, 2022, estimated cost $180K, described as “Filing herewith Structural framing work for 1st, 2nd FLS. and Roof related to NB #B08021093-I1. as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Feb 26, 2020, estimated cost $3K, described as “Install illuminated non-advertising business accessory sign on the wall.”
- Alteration, filed Jan 13, 2020, estimated cost $12K, described as “Extension of existing gas piping to flammable burn unit in paint spray booth. no change co, egress, zoning.OT- GEN CON JOB #321984796. MS- MECHANICAL JOB# B00219399. SP-SPRINKLER JOB #B00219450.”
- Alteration, filed Jan 13, 2020, estimated cost $22K, described as “Revised places per FDNY objection letter dated june 5 2023 2023-tmengr-004016-plan”
- Alteration, filed Jan 13, 2020, estimated cost $18K, described as “Extension of existing sprinkler system piping to paint spray booth and mixing room for fire suppression. No change to egress, co, or zoning. Ot JOB#321984796. Ms job# B00219399. Pl job# B00219426.”
- Alteration, filed Aug 27, 2018, estimated cost $80K, described as “Tmobile - Installation of antenna sectors with related RRU's, and mw antennas on the roof. Installation of exterior cabinets on steel platform on the roof. All work is in compliance with TPPN 5/98. No change in use, egress, or occupancy.”
- Alteration, filed Feb 16, 2018, estimated cost $5K, described as “Erect accessory d/f pylon sign in side of property line, no change to use, egress or occupation”
- Alteration, filed Dec 29, 2017, estimated cost $1K, described as “Installation of temporary construction fence in conjunction with NB 320625560”
Property taxes
- Assessment
- $18,073,800
- 2026–27 tax
- $398,530
- Market value (city estimate)
- $40,164,000
- Taxable value
- $14,878,440
- Assessed land
- $1,328,850
- Assessed improvements
- $16,744,950
Tax breaks
- ICAP abatement, through Jun 30, 2034, a $1,215,483 credit this tax year.
Zoning
C8-1: floor area ratio 1.33 built, above the 1.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).