# 2960 Brighton 4th Street, Brooklyn

Apartment Building · 22 units · built 2019 · Block 8663, Lot 277.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3086630277/2960-brighton-4-street

More construction in Brighton Beach: https://umarelli.org/nyc/brooklyn/brighton-beach.md

Every lot on block 8663: https://umarelli.org/nyc/brooklyn/8663.md

## Building permits

- Alteration, filed Nov 4, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Oct 16, 2026, estimated cost $20K, described as “Builders pavement plan in conjunction with NB #320909371.”
- Alteration, filed Apr 13, 2023, estimated cost $130K, described as “Installation of automatic sprinkler and standpipe system filed in conjunction with new building #320909371”
- Alteration, filed Apr 12, 2023, estimated cost $45K, described as “(HVAC) mechanical system in conjunction with NB application #320909371”
- Alteration, filed Apr 6, 2023, estimated cost $90K, described as “Plumbing in conjunction with NB application #320909371”
- Alteration, filed Mar 21, 2023, estimated cost $5K, described as “Installation of the temporary standpipe in conjunction with NB #320909371”
- Alteration, filed Dec 5, 2022, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 18, 2022, estimated cost $8K, described as “Installation of the construction fence in conjunction with NB#320909371”
- Alteration, filed Sep 17, 2021, estimated cost $20K, described as “Installation of roof protection as per plans. All equipment shall comply with chapter #33 of the 2014 code no change to use, egress, or occupancy.”
- Alteration, filed Aug 11, 2021, estimated cost $8K, described as “Installation of needle beams as per plans. Needle beam shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 23, 2021, estimated cost $10K, described as “Installation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed May 16, 2019, estimated cost $5K, described as “Installation of a construction fence in conjunction with a new building”
- Alteration, filed Feb 18, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Building history

- New Building — Mid-Rise, filed Sep 15, 2015, permit issued - entire job/work, 22 units, 12 stories
- Demolition, filed Feb 6, 2014, signed off Aug 7, 2015, units 1 to 0, stories 1 to 0, described as “Full demolition of one family dwelling.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $1,298,850
- 2026–27 Tax: $161,356
- Market value (city estimate): $2,886,334
- Taxable value: $1,298,850
- Assessed land: $428,850
- Assessed improvements: $870,000

## Zoning

R6: floor area ratio 2.44 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29).

## In the news

[Work Remains Stalled on 2960 Brighton 4th Street in Brighton Beach, Brooklyn](https://newyorkyimby.com/2024/11/work-remains-stalled-on-2960-brighton-4th-street-in-brighton-beach-brooklyn.html), New York YIMBY, Nov 5, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
