# 3145 Brighton 4th Street, Brooklyn

Condominium · 96 units · built c. 1929 · Block 8690, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3086907501/3145-brighton-4-street

More construction in Brighton Beach: https://umarelli.org/nyc/brooklyn/brighton-beach.md

Every lot on block 8690: https://umarelli.org/nyc/brooklyn/8690.md

## Building permits

- Alteration, filed Nov 7, 2025, estimated cost $20K, described as “Proposing to replace existing buildings front steps as per plans filed no change in use egress or occupancy”
- Alteration, filed Oct 22, 2025, estimated cost $18K, described as “Plumbing work in apt 410”
- Alteration, filed Oct 22, 2025, estimated cost $15K, described as “Interior renovation in apt 410”
- Alteration, filed Aug 1, 2025, estimated cost $8K, described as “Application hereby filed to propose emergency work to be done by replacing a fire escape drop ladder and a steel platform as per special operation inspection unit no change in use egress or occupancy”
- Alteration, filed Nov 19, 2024, estimated cost $63K, described as “Interior renovation of an existing Studio Apartment in a 6 story multiple dwelling; no change to Use, Bulk, Occupancy or Egress”
- Alteration, filed Nov 6, 2024, estimated cost $19K, described as “Application hereby filed to propose partial sprinkler system taken off domestic water service for coverage at cellar level no change in use egress or occupancy”
- Alteration, filed May 16, 2024, estimated cost $44K, described as “New plumbing fixtures proposed in an eating and drinking establishment no change in use egress or occupancy Please note Kitchen hood, Kitchen Exhaust, & Ductwork is approved under appl. B01051012-I1”
- Alteration, filed May 14, 2024, estimated cost $45K, described as “Proposing existing kitchen exhaust system to be installed at cellar level no change in use egress or occupancy”
- Alteration, filed May 14, 2024, estimated cost $65K, described as “Proposing to install new HVAC system for an eating and drinking establishment as per plans filed. No change in use egress or occupancy”
- Alteration, filed May 14, 2024, estimated cost $125K, described as “Proposing new plumbing work and partial sprinkler system at cellar and first from domestic line as per plans filed. No change in use egress or occupancy”
- Alteration, filed Jul 31, 2023, estimated cost $12K, described as “Alt 2 for replacement of two air-cooled outdoor condensers.”
- Alteration, filed Apr 28, 2021, estimated cost $10K, described as “Plumbing work in apt 308”
- Alteration, filed Apr 28, 2021, estimated cost $20K, described as “Interior renovation of apt 308.”
- Alteration, filed Dec 7, 2020, estimated cost $10K, described as “Interior renovation of apt 610”
- Alteration, filed Dec 26, 2019, estimated cost $15K, described as “Replacing and relocating plumbing fixtures as per plans.”
- Alteration, filed Nov 26, 2019, estimated cost $18K, described as “Plumbing renovation in apt 615 as per plans”

## Property taxes

- Assessment: $4,508,550
- 2026–27 Tax: $473,622
- Market value (city estimate): $10,019,000
- Taxable value: $4,097,790
- Assessed land: $275,400
- Assessed improvements: $4,233,150
- Condo units with their own tax lots: 2

## Zoning

R7-1: floor area ratio 5.47 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Mar 23, 2026: $437,000
- Mar 17, 2026: $395,000
- Jul 8, 2025: $340,000
- Jan 10, 2025: $1,800,000, Unit COMM
- Jul 22, 2024: $355,000
- Apr 12, 2024: $590,000
- Sep 7, 2023: $372,000
- Jun 26, 2023: $1,300,000, Unit COMM
- Apr 26, 2023: $470,000
- Mar 29, 2022: $600,000

The 10 most recent of 24 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
