# 1-55 54th Avenue, Queens

Vacant land · Block 6, Lot 160.

On Umarelli: https://umarelli.org/nyc/4000060160/1-55-54-avenue

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 6: https://umarelli.org/nyc/queens/6.md

## Building permits

- Alteration, filed Mar 17, 2026, estimated cost $65K, described as “Herewith filing for new seismic braces installation for electrical.”
- Alteration, filed Mar 17, 2026, estimated cost $65K, described as “Herewith filing for new seismic braces installation for fuel oil piping. No change in use, egress or occupancy.”
- Alteration, filed Nov 7, 2025, estimated cost $2K, described as “Equipment used to load/unload materials & install vertical protection system, mesh and cantilevers”
- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Roof Protection for Amtrak in conjunction with five story new school building.”
- Alteration, filed Sep 9, 2025, estimated cost $65K, described as “Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.”
- Alteration, filed Sep 5, 2025, estimated cost $533K, described as “Application file for vertical protection. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 13, 2025, estimated cost $25K, described as “Sidewalk shed in conjunction with 5 story new school building.”
- Alteration, filed May 22, 2025, estimated cost $25K, described as “Construction fence in conjunction with 5 story new school building and all related applications.”
- Alteration, filed Aug 13, 2024, estimated cost $20K, described as “Sod/PS341Q - for temporary shoring of detention tanks submitting on behalf of contractor, related to DOB # 421104147,Q01082433 no change in use, occupancy or egress”
- Alteration, filed Aug 12, 2024, estimated cost $20K, described as “Fn/PS341Q - for temporary construction equipment(fence) submitting on behalf of contractor, related to DOB # 421104147,Q00822160 phase -1 of new school building that includes foundations and detention tank for early work package. No change…”
- Alteration, filed Aug 6, 2024, estimated cost $20K, described as “Soe/PS341Q - for temporary support of excavation submitting on behalf of contractor, related to DOB # 421104147, Q01082433, Q00822160 no change in use, occupancy or egress”
- Alteration, filed Feb 14, 2023, estimated cost $1.0M, described as “This application is to provide a 275 gallons capacity emergency generator and 80 gallon capacity day tank solely to provide emergency power for the school. The generators will be installed on the roof. NB DOB#421104147”
- Alteration, filed Feb 8, 2023, estimated cost $10K, described as “Filing herewith partial demolition for site clearance and an existing one (1) story shed as per drawing.”

## Property taxes

- Assessment: $516,120
- Market value (city estimate): $8,602,000
- Taxable value: $0
- Assessed land: $516,120

## Zoning

R10: floor area ratio 0.00 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
