Apartment building · 372 units · built 2000 · Block 17, Lot 28.
Building permits
- Alteration, filed Oct 28, 2026, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed.”
- Alteration, filed Jul 7, 2026, estimated cost $364K, described as “Exterior Restoration consisting of concrete eyebrow spall repairs, brick masonry repointing, replacement, overhead concrete repairs at balconies, and coping repairs as per plans. No change in use, egress of occupancy.”
- Alteration, filed Jun 15, 2026, described as “Installation of temporary industrial rope access for facade inspections.”
- Alteration, filed Mar 11, 2026, estimated cost $10K, described as “This location has a 5 ton split system that was replaced.”
- Alteration, filed Feb 7, 2025, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSM SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jan 17, 2025, estimated cost $150K, described as “Mechanical work to replace existing exhaust fans on roof and install new toilet exhaust on 1ST floor and associated ducts and piping as shjown on plans filed herewith. No change in egress, use, or occupancy.”
- Alteration, filed Mar 8, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Dec 20, 2021, estimated cost $45K, described as “Filing for the installation of two 4" backwater valves on the first floor. One in garage area and one in compactor room with floor drain on first floor and modification to water sanitary piping on the third floor garage area as per plans…”
- Alteration, filed May 17, 2021, estimated cost $53K, described as “Installation of 5 ductless units on the rooftop with a total capacity of 15 tons. No change to egress, use, or occupancy.”
- Alteration, filed Feb 17, 2021, estimated cost $30K, described as “Herewith filing plumbing work for domestic water and sanitary water in compliance with local law 110 of 2013 and 2014 NYC building code section 614.1, whereas buildings are required to provide alternative potable water access.”
- Alteration, filed Jan 17, 2020, estimated cost $129K, described as “Filing for three (3) mechanical split systems. Plumbing work filed in DOB NOW and dunnage filed in DOB BIS.”
- Alteration, filed Jan 17, 2020, estimated cost $3K, described as “Filing for plumbing work associated with two roof top units. Mechanical work filed in DOB NOW and dunnage work filed in DOB BIS. PAA filed to correct plumbing notation to direct replacement of mechanical units. No change to plans”
- Alteration, filed Sep 25, 2019, estimated cost $459K, described as “Installation of cooling tower heat exchanger and related piping. No change in use egress or occupancy.”
Property taxes
- Assessment
- $61,438,950
- Market value (city estimate)
- $136,531,000
- Taxable value
- $0
- Assessed land
- $1,498,500
- Assessed improvements
- $59,940,450
Zoning
M3-1: floor area ratio 21.38 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
In the news
Permits Filed for a 32-Story Tower at 2-01 50th Avenue in Long Island City, Queens, New York YIMBY, Dec 20, 2020.