# 5-33 48th Avenue, Queens

Condominium · 41 units · built c. 1931 · Block 30, Lot 7503.

On Umarelli: https://umarelli.org/nyc/4000307503/5-33-48-avenue

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 30: https://umarelli.org/nyc/queens/30.md

## Building permits

- Alteration, filed Nov 18, 2026, described as “IRA Facade inspections as per the plans”
- Alteration, filed Apr 24, 2026, estimated cost $3K, described as “Proposed installation of 1 illuminated non-flashing accessory business sign. Wording "evergrow" "pediatric dentistry" "5-33"”
- Alteration, filed Feb 27, 2025, estimated cost $3K, described as “Propose illuminated, non-flashing accessory business sign. Wording: evergreen PEDIATRIC DENTISTRY/ 5-33”
- Alteration, filed Sep 27, 2024, estimated cost $132K, described as “Interior renovations for dental office at 1ST floor ; no change to use, egress or occupancy”
- Alteration, filed Jan 2, 2024, estimated cost $10K, described as “Renovation of existing commercial space on first floor only with plumbing work as per plan. No change in use, egress or occupancy under this application.”
- Alteration, filed Jan 2, 2024, estimated cost $10K, described as “Renovation of existing commercial space on first floor only with general construction as per plan. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 26, 2023, estimated cost $30K, described as “Structural repairs to roof terrace. no change in use, egress or occupancy”
- Alteration, filed Sep 26, 2023, estimated cost $50K, described as “Proposed repair to roof terrace. No chance of use, occupancy or egress”
- Alteration, filed Aug 15, 2023, estimated cost $3K, described as “Modification of storm system”
- Alteration, filed Nov 9, 2022, estimated cost $94K, described as “Interior build out for an existing commercial space at #5-31 into a medical office. No change the use, egress and occupancy.”
- Alteration, filed Sep 8, 2022, estimated cost $15K, described as “Modify existing sprinkler system according to new floor layout in 1ST floor.no change in use,egress and occupancy.”
- Alteration, filed Aug 25, 2022, estimated cost $10K, described as “Interior renovation work to the retail space # 1( Hair salon) , installation interior lighting and power. No change to use, egress or occupancy.”
- Alteration, filed Aug 16, 2022, estimated cost $5K, described as “Interior plumbing work to the retail space # 1( Hair salon). No change to use, egress or occupancy.”
- Alteration, filed Aug 10, 2022, estimated cost $26K, described as “Existing commercial space, mechanical system in conjunction with job #Q00781767, obtain mechanical permit for the install ventilation system works.”
- Alteration, filed Aug 8, 2022, estimated cost $48K, described as “Existing commercial space, plumbing system in conjunction with DOB now job #Q00781767, obtain plumbing permit for the install plumbing fixtures works.”
- Alteration, filed Aug 1, 2022, estimated cost $95K, described as “Existing commercial space, interior renovation modify partition for proposed at first floor, finish painting throughout, plumbing and mechanical work at DOB now application; no change in use, egress or occupancy.”
- Alteration, filed Feb 27, 2022, estimated cost $27K, described as “Modification of existing sprinkler system filing in conjunction with alteration type 1 application 420259945. No change in use, egress or occupancy.”
- Alteration, filed Feb 16, 2022, estimated cost $74K, described as “Installation of plumbing system in conjunction with alt 1 application #Q00660449. No change in use, egress or occupancy.”
- Alteration, filed Feb 15, 2022, estimated cost $140K, described as “Installation of new split system in conjunction with alt 1 application # Q00660449. No change in use, egerss or occupancy.”
- Alteration, filed Feb 9, 2022, estimated cost $278K, described as “Convert two commercial units on the first floor into five commercial units. Work includes change of occupancy and egress.”
- Alteration, filed Aug 23, 2021, estimated cost $41K, described as “Formally filing to construct three ADA bathrooms and partition in commercial space on First Floor.”
- Alteration, filed Jun 6, 2019, estimated cost $3K, described as “Install 12'-0" curb cut.”
- Alteration, filed Mar 27, 2018, estimated cost $10K, described as “Installation of heavy duty sidewalk shed & pipe scaffold, needle beams, roof protection as per plans. Sidewalk shed live load 300 psf. Sidewalk shed & pipe scaffold, needle beams, roof protection shall comply with chapter #33 of the 2014…”

## Property taxes

- Assessment: $6,595,655
- 2026–27 Tax: $738,219
- Market value (city estimate): $14,657,005
- Taxable value: $6,177,089
- Assessed land: $493,204
- Assessed improvements: $6,102,451
- Condo units with their own tax lots: 48

## Zoning

M1-4/R7A: floor area ratio 4.08 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 6, 2026: $1,652,500, Apt 3A
- Nov 20, 2025: $1,200,000, Apt 2C
- May 28, 2025: $1,392,500, Apt 6K
- Aug 13, 2024: $2,250,000, Apt PH2
- Jul 19, 2024: $1,500,000, Apt 4A
- Dec 10, 2021: $640,000, Apt 4H
- Oct 6, 2021: $1,230,000, Apt 4G
- Sep 30, 2021: $1,240,000, Apt 6M
- Sep 2, 2021: $1,260,000, Apt 3G
- Sep 1, 2021: $1,329,000, Apt 6K

The 10 most recent of 46 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
