# 27-11 49th Avenue, Queens

Industrial · built 1965 · Block 115, Lot 1.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/4001150001/27-11-49-avenue

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 115: https://umarelli.org/nyc/queens/115.md

## Building permits

- Alteration, filed Nov 2, 2026, estimated cost $985K, described as “Filing herewith proposal structural repairs/modifications as indicated on plans. No change to use egress or occupancy”
- Alteration, filed May 19, 2025, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 27, 2025, estimated cost $26K, described as “Filing herewith structural repairs as per plans.”
- Alteration, filed Jul 15, 2024, estimated cost $5K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 24, 2024, estimated cost $1.5M, described as “Roof recovery system installation with minor patching and associated masonry for perimeter flashing installation as per plans herewith. No work proposed outside of roof areas. No change to use, egress, or occupancy.”
- Alteration, filed Jun 17, 2024, estimated cost $541K, described as “Repair to existing piles/pile encasements as per plans herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jan 10, 2023, estimated cost $100K, described as “Filing for the Masonry wall replacement at Stairs, exterior Masonry wall repairs and removal of concrete Canopy.”
- Alteration, filed Oct 20, 2020, estimated cost $50K, described as “New Duel Fuel gas & oil fired boiler plant to replace the existing including new boiler, burner, safety controls, steam and condensate return piping, breeching, chimney, insulation, all appurtenances required for a complete operational…”
- Alteration, filed Oct 20, 2020, estimated cost $50K, described as “New Duel Fuel Gas & Oil, Fired Boiler Plant to replace the existing including New Boiler, Burner, Safety controls, Gas piping domestic cold water piping, insulation, and all appurtenances required for a complete operational system. Filed…”
- Alteration, filed Oct 20, 2020, estimated cost $50K, described as “Proposed boiler replacement all as per plans filed herewith.”
- Alteration, filed Oct 16, 2019, estimated cost $30K, described as “Proposed mechanical work on floors 002 & roof to be filed in conjunction to new 2ND floor cafeteria and additional offices.”
- Alteration, filed Oct 16, 2019, estimated cost $12K, described as “Proposed sprinkler work filed related to new lunchroom on 2ND floor with additional offices.”

## Building history

- Alteration, filed Apr 22, 2003, signed off Jan 29, 2009, described as “The purpose for filing this alt 1 application is to obtain a new certificate of occupancy which adds a third floor mezzanine. No work is being done under this application. All work to be performed will be by separate application alt ii…”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $9,131,850
- 2026–27 Tax: $825,381
- Market value (city estimate): $20,293,000
- Taxable value: $7,608,600
- Assessed land: $2,421,900
- Assessed improvements: $6,709,950

## Tax breaks

- ICAP/ICIP exemption, through Jun 30, 2029, about $36,261 a year below the full tax.

## Zoning

M3-2: floor area ratio 2.00 built, 2.00 allowed by base zoning.

## Recent sales

- Jun 3, 2022: $105,500,000
- Aug 31, 2020: $75,000,000, 214,820 sq ft ($349 per sq ft)

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Board and land use applications

- Long Island City BID Expansion (City Planning 2024Q0254): Business Improvement District, Completed, filed Feb 2, 2024. An application from the Small Business Services (SBS) on behalf of the Long Island City Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 1 and 2 of Queens.
- MANA Products Text Amendment (City Planning P2018Q0142): Completed, decided Jun 5, 2019. A text amendment to ZR 43-121 expanding the qualifications for enlargement to existing manufacturing buildings
- MULTI-AGENCY FACILITY (City Planning P1998Q0416): Completed. 98BEL001Q: CITY OF NEW PROPOSES TO OBTAIN A LONG-TERM LEASE AT 27-11 49 TH AVENUE IN QUEENS C.B.#2 FO RUSE A S MULTI-AGENCY FACILITY FOR THE BOARD OF ELECTIONS AND NEW YORK CITY POLIC DEPT
- BD OF ELECTIONS & NPD BARRIER SHOP (City Planning P1998Q0177): Completed, decided Jun 8, 1998. SITE SELECTION & ACQUISITION OF THIS BLDG, THE 1ST FLOOR IS\*FOR NYPD BARRIER SHOP & FLOORS 2 & 3 FOR THE BD OF ELECTIONS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology