# 39-10 43rd Street, Queens

Auto Repair · built 1989 · Block 183, Lot 332.

On Umarelli: https://umarelli.org/nyc/4001830332/39-10-43-street

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 183: https://umarelli.org/nyc/queens/183.md

## Building permits

- Alteration, filed May 18, 2023, estimated cost $93K, described as “Support framing for new rolling gates. No change in use, egress or occupancy.”
- Alteration, filed Dec 22, 2022, estimated cost $2K, described as “Erect illuminated, accessory business channel letter wall sign-A3, no change to use, egress or occupation”
- Alteration, filed Dec 22, 2022, estimated cost $8K, described as “Erect illuminated, accessory business channel letter wall sign-c, no change to use, egress or occupation”
- Alteration, filed Dec 22, 2022, estimated cost $3K, described as “Erect illuminated, accessory business channel letter wall sign-d, no change to use, egress or occupation”
- Alteration, filed Dec 22, 2022, estimated cost $2K, described as “Erect illuminated, accessory business channel letter wall sign-A1, no change to use, egress or occupation”
- Alteration, filed Dec 22, 2022, estimated cost $5K, described as “Erect illuminated, accessory business channel letter wall sign-b, no change to use, egress or occupation”
- Alteration, filed Dec 22, 2022, estimated cost $2K, described as “Erect illuminated, accessory business channel letter wall sign-A2, no change to use, egress or occupation”
- Alteration, filed Sep 26, 2022, estimated cost $191K, described as “Renovation of building exterior wall facades. Facade scope is limited to adding ACM panels to South side, replacing existing doors and converting two of the overhead doors to windows. No change to use, egress or occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $2.0M, described as “Interior modifications to existing 1 story building used as an automotive service center.”
- Alteration, filed Aug 23, 2022, estimated cost $38K, described as “Modifications to existing Sprinkler system as per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $314K, described as “Modifications to the mechanical system”
- Alteration, filed Aug 23, 2022, estimated cost $183K, described as “Plumbing modifications in existing automotive service center. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2019, estimated cost $380K, described as “Mechanical modifications as per plans filed herewith. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $6,687,900
- 2026–27 Tax: $701,552
- Market value (city estimate): $14,862,000
- Taxable value: $6,467,105
- Assessed land: $3,143,700
- Assessed improvements: $3,544,200

## Zoning

M1-1: floor area ratio 0.28 built, 1.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
