# 33-00 Northern Boulevard, Queens

Condominium · built c. 1915 · Block 214, Lot 7501.

On Umarelli: https://umarelli.org/nyc/4002147501/33-00-northern-boulevard

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 214: https://umarelli.org/nyc/queens/214.md

## Building permits

- Alteration, filed Aug 24, 2026, estimated cost $15K, described as “Replacement of fire sprinkler booster & jockey pump in kind.”
- Alteration, filed Feb 13, 2026, estimated cost $7K, described as “Construction fence at the sidewalk.”
- Alteration, filed Sep 30, 2025, estimated cost $1K, described as “Installation of temporary work platform & pipe scaffold system as per plan. No change in use, egress, or occupancy. The work platform & pipe scaffold system inside the existing elevator shaft from the 1ST floor to the below roof/penthouse…”
- Alteration, filed Jul 21, 2025, estimated cost $306K, described as “Filed herewith for interior renovation as per plans.”
- Alteration, filed Mar 11, 2025, estimated cost $90K, described as “Install new gas service, meter and piping per plans.”
- Alteration, filed Feb 21, 2025, estimated cost $108K, described as “Filed herewith for mechanical ventilation design as per plans, no change to use, egress or occupancy.”
- Alteration, filed Aug 29, 2024, estimated cost $50K, described as “Filed herewith for interior removal of non-load bearing walls as per plan, no change to use egress or occupancy.”
- Alteration, filed Aug 15, 2024, estimated cost $30K, described as “Filed herewith to install steel dunnage on roof as per plans, no change to use, egress or occupancy”
- Alteration, filed Aug 14, 2024, estimated cost $90K, described as “Filing ms for interior tenant fit out on the 6TH-8TH floors”
- Alteration, filed Aug 12, 2024, estimated cost $78K, described as “Filing sp for interior tenant fit out on the 6TH-8TH floors”
- Alteration, filed Aug 12, 2024, estimated cost $60K, described as “Filing pl for interior tenant fit out on the 6TH-8TH floors”
- Alteration, filed Jul 29, 2024, estimated cost $108K, described as “Filing gc for interior tenant fit out on the 6TH-8TH floors”
- Alteration, filed Jul 17, 2024, estimated cost $207K, described as “Filing ms for interior tenant fit out on the 1ST and 5TH floors”
- Alteration, filed Jul 16, 2024, estimated cost $181K, described as “Filing sp for interior tenant fit out on the 1ST and 5TH floors”
- Alteration, filed Jul 16, 2024, estimated cost $155K, described as “Filing pl for interior tenant fit out on the 1ST and 5TH floors along with instiallation of gas riser and 2 gas generators”
- Alteration, filed Jul 9, 2024, estimated cost $362K, described as “Filing gc for interior tenant fit out on the 1ST and 5TH floors”
- Alteration, filed Apr 19, 2024, estimated cost $420K, described as “Filed herewith for interior renovation as per plan, no change to use egress or occupancy.”
- Alteration, filed Mar 14, 2024, estimated cost $76K, described as “Filed herewith to remove interior non-load bearing partitions, no change to use egress or occupancy.”
- Alteration, filed Mar 13, 2024, estimated cost $120K, described as “Filed herewith for minor change to secondary egress route from stair j on first floor of existing commercial building.”
- Alteration, filed Mar 8, 2024, described as “CD5 amendment for adding platform and outrigger system as shown on the plans.”
- Alteration, filed Jan 12, 2024, estimated cost $7K, described as “Install supported pipe scaffold as shown on the plans. No change in use, egress, or occupancy under this application”
- Alteration, filed Dec 18, 2023, estimated cost $18K, described as “File plumbing work with installation of plumbing fixtures and sprinkler work of modification of sprinkler system in proposed deli store as per plan. No change of use, egress or certificate of occupancy.”
- Alteration, filed Dec 18, 2023, estimated cost $63K, described as “General renovation of proposed deli store with new partition, floor tiles, ceilings, doors, paint and mechanical work of new kitchen hood exhaust and HVAC system as per plan. No change in use, egress or occupancy.”
- Alteration, filed Oct 26, 2023, estimated cost $200K, described as “Interior renovation as shown on plans filed herewith.”
- Alteration, filed Feb 14, 2023, estimated cost $152K, described as “Facade restoration as per plans filed herewith. No change in use, egress or occupancy.”

17 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/4002147501/33-00-northern-boulevard.

## Building history

- Alteration, filed Feb 5, 2020, permit issued - entire job/work, described as “No work application to establish adult trade school on part of cellar and to secure amended certificate of occupancy. No change to existing floor layout, bathroom fixtures, mechanical system, sprinkler system or fire alarm system.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $35,430,753
- 2026–27 Tax: $2,963,114
- Market value (city estimate): $78,735,000
- Taxable value: $22,868,966
- Assessed land: $1,412,102
- Assessed improvements: $34,018,651
- Condo units with their own tax lots: 14

## Zoning

M1-5: floor area ratio 7.29 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jun 17, 2022: $172,750,000, Apt 1, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Long Island City BID Expansion (City Planning 2024Q0254): Business Improvement District, Completed, filed Feb 2, 2024. An application from the Small Business Services (SBS) on behalf of the Long Island City Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 1 and 2 of Queens.
- MATERIALS FOR THE ARTS (City Planning P2007Q0148): Completed, decided Apr 19, 2007. SITE SELECT & ACQ TO CONTINUE TO OPERATE & EXPAND THE FACLTY

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology